Laserfiche WebLink
Washington State <br />�� Department of Transportation <br />Local Agency Federal Aid <br />Project Prospectus <br />Prefix <br />Route <br />( ) <br />Date <br />11/17/2023 <br />Federal Aid <br />Project Number <br />HSIP <br />DUNSNumber <br />01-020-2547 <br />Lo 1 I Agency <br />Project Number <br />RC 2298 <br />i WSDO y 1 <br />` Use Only J <br />Federal Employer <br />Tax ID Number <br />91-601349 <br />Agency <br />CAAgency <br />Federal Program Title <br />Kittitas County Public Works <br />WJ Yes ❑ No <br />FVI 20.205 ❑ Other HSIP <br />Project Title <br />Start Latitude N 47.181726 <br />Start Longitude W-120.954167 <br />Horizontal Curve Safety Project <br />End Latitude N 47.165419 <br />End Lon itude W-120.012574 <br />Project Termini From -To <br />Nearest City Name <br />Project Zip Code (+4) <br />countywide countywide <br />Ellensburg <br />98926-7989 <br />Begin Mile Post <br />End Mile Post <br />Length of Project <br />Award Type <br />countywide <br />countywide <br />countywide <br />Z Local ❑ Local Forces ❑ State ❑ Railroad <br />Route ID <br />Begin Mile Point <br />End Mile Point <br />City Number <br />County Number <br />County Name <br />countywide <br />countywide <br />19 <br />Kittitas <br />WSDOTRegion <br />Legislative District(s) <br />Congressional District(s) <br />Urban Area Number <br />South Central Region <br />13 <br />8 <br />Total <br />Local Agency <br />Federal Funds <br />Phase Start <br />Phase <br />Estimated Cost <br />Funding <br />Date <br />Nearest Hundred Dollar <br />Nearest Hundred Dollar <br />Nearest Hundred Dollar <br />Month Year <br />P.E. <br />225,000.00 <br />225,000.00 <br />November 2023 <br />R/W <br />Const. <br />225,000.00 <br />225,000.00 <br />Total <br />450,000.00 <br />450,000.00 <br />Description of Existing Facility (Existing Design and Present Condition) <br />Roadway Width <br />Number of Lanes <br />varies <br />varies <br />Many roads have hazardous curves and non standard or non-existent delineation. <br />Description of Proposed Work <br />Description of Proposed Work (Attach additional sheet(s) if necessary) <br />Collect data and install/upgrade signing for horizontal curves (such as advisory speeds, chevrons, delineation). <br />Local Agency Contact Person <br />Title <br />Phone <br />Darren Case <br />Construction Manager <br />509-962-7019 <br />Mailing Address <br />City <br />State <br />Zip Code <br />411 N. Ruby, Suite 1 <br />Ellensburg <br />WA <br />98926 <br />By <br />Project Prospectus <br />Approving Authority <br />Title County Engineer <br />Date vorlZCF'3 <br />DOT Form 140-101 Page l <br />Revised 01/2022 Previous Editions Obsolete <br />