Laserfiche WebLink
CRP/RC #: 286-18 <br />r Resolution #: 2018-054 Bar 14 Road <br />Location: MP 1.11-MP 1.21 Bar 14 Rd, Ellensburg Turnaround 26 <br />- — Last Updated: 8/15/2023 <br />Project Number: RC1583-GI Length: 0.10 miles <br />Basis for Project Repair flood damage, school bus turnaround. Construction: 2024 <br />Project Description: <br />2017 flood events caused water to overtop Bar 14 Road at Bridge #89041. Subsequent inspection found significant damage <br />to one of the girders. The County removed the bridge and completed channel repair work to alleviate flood problems. While <br />the County plans to pursue funding to replace the bridge, the funding is competitive and Bar 14 Road does not see sufficient <br />daily traffic. Since the likelihood of obtaining funds in the near future is remote, the county will build a turnaround at each <br />dead end until funding is secured. Work will be done by County Forces. <br />Status: Construction in 2024 <br />Traffic Impacts: Minimal, but TBD. <br />Funding Source: <br />Local S175.000 <br />funding <br />Total: $175.000 <br />Flood event of 2017; overtopping bridge. <br />Bar 14 Rd with barricades after bridge removed. <br />F& mm intnrmaaan on tha projon, t mtacr Pubk works as 509-%2.7.Si3 or pulllinrerhs�ra.k,etxu.ra s <br />Frequently Asked Questions Page 151 <br />