Laserfiche WebLink
CRP/RC #: <br />Location: MP 0.13 to MP 0.25 Sanders Rd Sanders Rd Improvements <br />Last Updated: 8/14/2023 <br />22 <br />Project Number: Length: 0.12 miles <br />Basis for Protect: Safetv. stormwater drainage, roadway improvement. Construction: 2029 <br />Project Description: <br />To accommodate the increase in traffic along Sanders Road and to link future developments to the City of Ellensburg, the <br />road will need to be widened. Non -motorized pathways wilt need to be constructed for pedestrian and bicycle use. This will <br />allow for a uniform roadway from County to city limits. work will include widening and paving the road, construction of side- <br />walk, and installation of drainage structures. Design anticipated in 2029. <br />Status: Design in 2029 <br />Traffic Impacts: TBD <br />Funding Source: <br />Local $400,000 <br />funding <br />TotaL• $400,000 <br />Looking east an Sanders Rd <br />_ l� <br />jig", <br />East an Sanders Rd <br />For mwe Info rEon anthitut <br />�- • CRP/RC #: <br />,.., Location: Teanaway Rd Teanaway Road Settling <br />Last Updated: 8/15/2023 <br />�� 1} 23 <br />Project Number: Length: TBD <br />Basis for Proiect: Safe, imarovements/countermeasures. Construction: 2029 <br />Project Description: <br />The Teanaway Road north of SR 970 was built on fill and has existing drainage issues. Settling is causing longitudinal cracks <br />In the southbound lane. The project will excavate to stable material, replace the drainage structure, and build back the road <br />including creating a roadway shoulder. <br />Status: Design and construction in 2028-2029. <br />Traffic Impacts: TBD <br />Funding Source: <br />FLAP funding $2.406,000 <br />Local funding $690,000 <br />Total: 3,096,000 <br />Teanaway Road north from SR 970 Survey work to monitor road settling <br />Far mer[ rniwmaean on Ihit "W. Contra Pub4c works st 909.962-M3 or publi.-# us <br />Frequently Asked Questions <br />Page 148 <br />