My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-2029 Six Year CIP Packet for Hearing Request
>
Meetings
>
2023
>
12. December
>
2023-12-05 10:00 AM - Commissioners' Agenda
>
2024-2029 Six Year CIP Packet for Hearing Request
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2023 12:42:38 PM
Creation date
11/30/2023 12:20:37 PM
Metadata
Fields
Template:
Meeting
Date
12/5/2023
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Set a Public Hearing to consider Adoption of the Capital Improvement Program for the Planning Period 2024-2029
Order
14
Placement
Consent Agenda
Row ID
111743
Type
Hearing notice
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
198
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CRP/RC #: <br />Location: MP 0.67 Lambert Rd over <br />Lambert Road Bridge <br />Teanaway River <br />Maintenance 19 <br />Last Updated: 8/14/2023 <br />Project Number: Length: 0.01 miles <br />Basis for Project: Maintenance and repairs. Construction: TBD <br />Project Description: <br />The Lambert Rd Bridge spans the Teanaway River and is need of preventative maintenance to extend the life of the bridge. <br />The original construction of the precast T-girders did not include an overlay, which allows water to infiltrate between the ad- <br />jacent flanges resulting In spans, delamination and cracks at the weld tab locations. A deck overlay would include allow for <br />repairs before adding deck membrane and modified concrete overlay. Construction funding anticipated programmed 2028. <br />Status: Design and Right of Way phases 2027 with construction in 2028 <br />Traffic Impacts: TBD <br />Funding Sources: <br />Planned <br />BRAC funds <br />Total: <br />S479.000 <br />$479,000 <br />Lambert Rd Bridge over the Teanaway River Joint damage visible at inspection <br />For more information on this project, contact Public Works at 509-962-7523 or publimorks@co.kitdtas.wa.us <br />Frequently Asked Questions <br />Page 145 <br />
The URL can be used to link to this page
Your browser does not support the video tag.