Laserfiche WebLink
0 <br />CRP/RC #: <br />Location: Various Badger Pocket Area Road <br />Last Updated: 8/14/2023 Improvements - Phase 2 13 <br />Project Number: Length: TBD <br />Basis for Project: Safetv, rehabilitation, & improvements. Construction: 2026 <br />Project Description: <br />An increase in agricultural activities in the Badger Pocket area has brought issues to the surface of road network. Poor road- <br />way construction, geometrics, narrow right of way widths, impacts to existing irrigation franchises, and congestion are some <br />of the Items to be addressed by phases as it affects many roads in the area. Priority roads to be determined prior to design, <br />Status: Planned for design 2025 and construction in 2026_ <br />Traffic Impacts: TBD <br />Funding Source: <br />Local. $2,780,000 <br />funding <br />Total: $2,780,000 <br />Orchard Rd and Perry Rd <br />.. �Y AOL rf rr.j �Y+ <br />a <br />ThraU Rd and Sorenson Rd <br />For more information on this project. contact Pubik Works at 509-962.7523 or pub1kveorkssew.kittitas.wa.us <br />Frequently Asked Questions <br />Page 139 <br />