Laserfiche WebLink
CRP/RC #: 317-23 <br />RESOLUTION#: 2023-109 Vantage Highway <br />Location: MP2.027 - MP 6.57 Vantage Hwy Paving 11 <br />Last Updated: 8/10/2023 <br />Project Number: RC2296-ST Length: 4.54 miles <br />Basis for Project: Road paving Construction: 2024 <br />Project Description: <br />The Vantage Highway is a major east/west corridor in the Lower Kittitas Valley. Regular roadway maintenance Improves road- <br />way safety while maintaining reliable infrastructure. This project will grind and overlay asphalt on Vantage Highway within <br />the existing pavement limits along with temporary and permanent pavement marking for repair, rehabilitation and preserva- <br />tion. <br />Status: Paving In 2024. <br />Traffic Impacts: Single lane closures. <br />Funding Sources: <br />STBG $3.459,000 <br />Local Funds $540,000 <br />Total: $3,999,000 <br />Kr a s7 <br />krl <br />wnwraoaa <br />Vantage Highway <br />— � amrrns <br />6— for rrwra In[yrmanan on Ih4 projea mm ace Puhllc Worh a 509-%R•75,3 or puElicWOrky�pp.�A1r�s.Yro.yy <br />Frequently Asked Questions Page 137 <br />