Laserfiche WebLink
- CRP/RC #: <br />Location: Cle Eluln to Easton I-90 Widening— Eastbound <br />Last Updated: 8/10/2023 and Westbound <br />2 <br />Project Number: RC2290-ST Length: Approximately 7.0 miles <br />Basis for Project: Improve Capacity and Safer Construction: TBD <br />Project Description: <br />High bypass traffic volumes through Upper County is a concern for residents and the condition of roads. This increase in traf- <br />fic when I-90 is busy results in degraded roadways as well as Increased safety concerns. A group was formed, the STEER I90 <br />Coalition, meets monthly to engage stakeholders to discuss issues and solutions. A feasibility study is underway to identify <br />scope of the project to increase capacity on 190 in each direction. <br />Status: Feasibility study underway. <br />Traffic Impacts: TBD <br />Funding Source: <br />Local $250.000 <br />Funds <br />_ .ras •_ <br />Total: $250,000 <br />Sw more q"matwn m IM PrgW. WnWt s'WK Wer►= of 7523 Or PUWkc " CO. li min. na ui <br />Frequently Asked Questions Page 128 <br />