My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024 - 2029 Six-Year Capital Improvement Plan - Final Draft 11-6-2023
>
Meetings
>
2023
>
11. November
>
2023-11-21 10:00 AM - Commissioners' Agenda
>
2024 - 2029 Six-Year Capital Improvement Plan - Final Draft 11-6-2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2023 1:48:48 PM
Creation date
11/16/2023 1:46:37 PM
Metadata
Fields
Template:
Meeting
Date
11/21/2023
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Set a Public Hearing for 2024-2029 Six Year Capital Improvement Program
Order
3
Placement
Consent Agenda
Row ID
111109
Type
Hearing notice
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
191
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Kittitas County Airport Facilities Page 26 <br /> <br />Airport Facilities – Rehabilitate Runway 11/29 including AGIS, <br />Runway Lighting, and Runway Width Reduction <br /> <br />Project Information and Selection Criteria <br />Location Bowers Field Airport, Ellensburg <br />Links to Other Projects or Facilities N/A <br />Description <br />Rehabilitate Runway 11/29 including completing an AGIS <br />survey, reducing the runway width from 150 feet to 75 feet <br />(per FAA requirements), drainage improvements, and <br />replacing the runway lighting system. <br />Justification (Need/Demand) <br />This project removes the outer 75 feet of failed asphalt <br />pavement and replaces the runway lighting system that has <br />outlived its useful life. <br />Level of Service (LOS) / Project Type <br />Established LOS: N/A <br />Project Type: Facility repair and renovation <br />Comprehensive Plan Citations CF-G4, CF-P28 <br /> <br />Capital Cost 2023 2024-2027 Total <br />Design and Engineering $165,000 $165,000 <br />Construction $385,000 $385,000 <br />TOTAL $550,000 $550,000 <br /> <br />Funding Sources 2023 2024-2027 Total <br />FAA GA Entitlement $500,000 $500,000 <br />Local Match $50,000 $50,000 <br />TOTAL $550,000 $550,000 <br /> <br />Annual Operations and Maintenance <br />Estimated Costs <br />Currently, the County does not track maintenance costs for <br />these improvements. <br />Estimated Revenues None <br />Anticipated Savings Due to Project None <br />Department Responsible for <br />Operations Airport Department <br />
The URL can be used to link to this page
Your browser does not support the video tag.