My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024 - 2029 Six-Year Capital Improvement Plan - Final Draft 11-6-2023
>
Meetings
>
2023
>
11. November
>
2023-11-21 10:00 AM - Commissioners' Agenda
>
2024 - 2029 Six-Year Capital Improvement Plan - Final Draft 11-6-2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2023 1:48:48 PM
Creation date
11/16/2023 1:46:37 PM
Metadata
Fields
Template:
Meeting
Date
11/21/2023
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Set a Public Hearing for 2024-2029 Six Year Capital Improvement Program
Order
3
Placement
Consent Agenda
Row ID
111109
Type
Hearing notice
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
191
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />2024-2029 Summary Page 21 <br /> <br />Partnership (CTP) program to <br />improve flood models and <br />channel migration zone <br />mapping. <br />Program <br />(potential), <br />FCZD Levy <br />Whisky Creek at <br />Ellensburg Water <br />Company (EWC) <br />Siphon <br />WNC. <br />Increase flood conveyance, <br />eliminate canal / creek <br />intermingling, and address fish <br />passage barrier by replacing <br />current EWC crossing at <br />Whiskey Creek with a siphon. <br />Kittitas County Conservation <br />District (KCCD) managed <br />project, with FCZD cost-share. <br />FCZD Levy, <br />Grant or partner <br />support for <br />construction <br />2028 TBD <br /> <br />Table 1 continued - Six-Year Plan Summary <br />2024-2029 Summary Kittitas County Public Facility Projects <br />Project Name Location & Description Funding Source Schedule Total Cost <br />Wilson-Naneum- <br />Cherry – Phase 2 <br />Whisky Reroute <br />Feasibility Study <br />WNC. <br />Hydrologic analysis with <br />existing 2-dimensional model to <br />evaluate Whiskey Creek tie-in <br />at Reecer Creek project. <br />Evaluate effects of Mercer <br />Creek flow routing north of the <br />airport on hydrologic regime, <br />design specification needed at <br />proposed railroad crossing, and <br />within Reecer Creek floodplain <br />site, and water needs <br />downstream of proposed <br />reroute site <br />FCZD Levy 2023 $100,000 <br />Wilson-Naneum- <br />Cherry – Phase 3 <br />Whisky Reroute <br />Design <br />WNC. <br />Implement capital <br />recommendations from Phase 2 <br />Feasibility Study <br />FCZD Levy, <br />Flood Control <br />Assistance <br />Account <br />Program <br />(potential) <br />2025-2027 $600,000 <br />Flow Conveyance <br />Restoration – Site 2 <br />WNC. <br />Implementation of project <br />similar to Mercer at Helena <br />flow conveyance project, site <br />TBD <br />FCZD Levy, <br />Ecology <br />Centennial <br />Clean Water <br />grant <br />(potential) <br />2023-2024 $360,000 <br />Flow Conveyance <br />Restoration – Site 3 <br />TBD. Implementation of project <br />similar to Mercer at Helena <br />flow conveyance project, site <br />TBD <br />FCZD Levy, <br />Ecology <br />Centennial <br />Clean Water <br />grant <br />(potential) <br />2025-2026 $392,000 <br />Crystal Creek <br />Conveyance Project <br />Crystal Creek. <br />Implement project identified <br />through Crystal Creek CTP <br />study. <br />Grant funding <br />TBD 2023-2024 $120,000
The URL can be used to link to this page
Your browser does not support the video tag.