Laserfiche WebLink
<br />Frequently Asked Questions Page 169 <br /> <br />Funding <br /> <br />Salmon Recovery Funding <br /> <br /> <br />Basis for Project: Yakima River Corridor Plan Schedule: 2024—2029 <br /> <br />Project Description: <br />The project will remove the failing Hansen Pit Levee and private berm located on Flood Control Zone District acquired property. <br />Levee removal restore ecological functions to the purchased properties, will reduce flood risks off-site and will reduce long-term <br />District operation and maintenance costs associated with the levee and berm. This project will also provide open space recrea- <br />tion and improve fish and wildlife habitat conditions. Conceptual design is underway, with implementation anticipated starting in <br />2027. <br /> <br />Status: Conceptual Planning underway <br /> Flood Impacts: Better managed flood hazard risks and improved floodplain function. <br /> <br /> <br /> <br /> <br /> <br />Project Name: #5 Hansen Floodplain Restoration <br />Yakima River—Ringer Reach <br />Last Updated: November 23, 2022