Laserfiche WebLink
<br />Frequently Asked Questions Page 164 <br /> Costs are shown as thousands <br />AR <br />E <br />A <br /> <br /> <br /> <br />KITTITAS COUNTY FLOOD CONTROL ZONE 2024-2029 <br />SIX YEAR CAPITAL IMPROVEMENT PLAN <br /> No <br />n <br />-Lo <br />c <br />a <br />l <br /> So <br />u <br />r <br />c <br />e <br /> <br /> 20 <br />2 <br />4 <br /> Lo <br />c <br />a <br />l <br /> <br /> 20 <br />2 <br />4 <br /> No <br />n <br />-Lo <br />c <br />a <br />l <br /> <br /> 20 <br />2 <br />5 <br /> Lo <br />c <br />a <br />l <br /> <br /> 20 <br />2 <br />5 <br /> No <br />n <br />-Lo <br />c <br />a <br />l <br /> <br /> 20 <br />2 <br />6 <br /> Lo <br />c <br />a <br />l <br /> <br /> 20 <br />2 <br />6 <br /> No <br />n <br />-Lo <br />c <br />a <br />l <br /> <br /> 20 <br />2 <br />7 <br /> Lo <br />c <br />a <br />l <br /> <br /> 20 <br />2 <br />7 <br /> No <br />n <br />-Lo <br />c <br />a <br />l <br /> <br /> 20 <br />2 <br />8 <br /> Lo <br />c <br />a <br />l <br /> <br /> 20 <br />2 <br />8 <br /> No <br />n <br />-Lo <br />c <br />a <br />l <br /> <br /> 20 <br />2 <br />9 <br /> Lo <br />c <br />a <br />l <br /> <br /> 20 <br />2 <br />9 <br /> No <br />n <br />-Lo <br />c <br />a <br />l <br /> <br />#1a FLOOD HAZARD RISK & REPETITIVE LOSS PROGRAM County Wide 60 <br /> 2027: Repetitive Loss Area Analysis. <br /> <br />#1b <br /> <br />REP. LOSS: EASTON REACH FLOOD STUDY Yakima River <br /> <br />FCAAP <br /> <br />15 <br /> 60 <br /> 2024: Technical Assistance for McElroy Bridge. 2027: additional technical support, Easton reach <br />erosional hazards <br />#3 KITTITAS REACH PROPERTY IMPROVEMENTS Yakima River IP 210 362 6 <br /> <br />Control for invasive species, riparian buffer plantings, and building decomissioning at County-owned properties <br />#5 HANSEN FLOODPLAIN RESTORATION Yakima River SRFB / IP 400 200 100 1500 50 1450 50 50 <br /> Implementation of preferred alternantive from Hanson Pits Restoration Plan and Design . 2024 Spreliminary Design. <br />2027-2029: Implementation <br />#6 REECER CREEK DOLARWAY TO UNIVERSITY WNC City of Ellensburg 1200 <br /> Flood Control Zone District Cost share in support of City of Ellensburg Project to purchase property, construct setback <br />levees and construct second bridge along Dolarway Rd. Amount shown in 2024 is the $850,000 already under <br />agreement, plus an additional $350,000 due to recent cost increases. <br />#7 STREAM GAGING AND EARLY WARNING SYSTEM County-Wide 15 15 30 30 40 40 <br /> 2024 - 2025 Capital set aside for replacement of current equipment. 2026-2029: site expansion. <br /> #8 CTP FLOOD STUDIES General <br /> <br />CTP <br /> 70 <br /> 30 50 30 50 <br /> <br />30 50 <br /> Continued funding through FEMA's Cooperating Technical Partnership (CTP) program to improve flood models and <br />channel migration zone mapping. <br />#10 WHISKEY CREEK AT EWC SIPHON WNC Private 1200 250 10 10 <br /> Increase flood conveyance, eliminate canal / creek intermingling, and address fish passage barrier by replacing <br />current EWC crossing at Whiskey Creek with a siphon. <br />#12 WNC-Phase 3 Whiskey Implementation WNC FEMA / FCAAP 40 80 100 400 <br /> Implement capital recommendations from Phase 2 Feasibility Study. 2024/2025: Final Design <br />and Permitting <br />#14 FLOW CONVEYANCE RESTORATION - Mercer Creek WNC Ecology 30 44 86 52 40 100 20 100 <br /> <br />MCF - KC partnership. Mercer at Helena project maintenance and Mercer Creek west of Railroad Ave Project Design <br />#15 FLOW CONVEYANCE RESTORATION - SITE 3 TBD Ecology 20 40 80 <br /> Implementation of project similar to Mercer at Helena flow conveyance project, site TBD <br />#16 CRYSTAL CREEK CONVEYANCE PROJECT Crystal Creek 20 100 <br /> Implement project identified through Crystal Creek CTP study <br /> #18 HAZARD MITIGATION PLAN UPDATE County-Wide <br /> 150 <br /> <br />200 <br /> <br /> The Multi-jurisdictional Hazard Mitigation Plan needs to be updated every 5-years. <br />#20 WEST ELLENSBURG INTERCHANGE Reecer / Currier 50 50 50 3000 <br /> Flood informed development effort in West Ellensburg Interchange. 2024: Finalization of preferred alternative and <br />design, 2025: CLOMR / environmental permitting; 2026-2027 Implementation <br />#21 CRS CRITICAL FACILITY COMPLIANCE Yakima River 750 1250 <br /> Address critical facility at flood risk from Yakima River flooding. Compliance required for continued good standing in <br />National Flood Insurance Program and Community Rating System. <br /> <br />