Laserfiche WebLink
keeping oncoming traffic off the bridge. Once both lanes are clear, EMS could approach from either <br />site. <br />4 Tr.,s should be clarified during the tabletop exercise or oefore if possible. <br />Vegetation Management <br />WSDOT plans to maintain 8'-10' of bare ground adjacent to the shoulder of the road to mitigate fire risk in the <br />project area. <br />Additional Project Lighting <br />Lighting is included in strategic areas within the project area. <br />Serious Collision or Fatality west of the project area <br />EMS will approach the site from Ellensburg. Traffic will be stopped or routed around the collision area per <br />typical operations with the help of WSP. EMS will turn through center median turn around area P and return to <br />Ellensburg. In the event air support is required, EMS will bring the patient to the Vantage Stockpile site. A <br />helicopter landing pad will be established. <br />i EUGOPTM <br />Lk4U(MG FAVI <br />Serious Collision or Fatality east of the project area <br />Travelling public will be directed to SR 26 if it is necessary to clear the highway. <br />