My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-11-13-minutes-public-works-study-session
>
Meetings
>
2023
>
11. November
>
2023-11-21 10:00 AM - Commissioners' Agenda
>
2023-11-13-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2023 2:04:24 PM
Creation date
11/16/2023 1:46:28 PM
Metadata
Fields
Template:
Meeting
Date
11/21/2023
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
111109
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
150
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Concerns and mitigations: <br />• WSDOT maintenance has confirmed that they merge the median crossover traffic to one lane with the <br />help of WSQ V4e :ail[ need to confirm VJSP particiaat cn and response t rne. <br />• Conflicting traffic movements in the contra lanes. Could traffic control be set up quickly in the contra <br />lane to merge to one lane and allo4v one lane of traffic floe4 frorn the center median cross over? <br />• Another option to merging to one lane and then using the median cross over at Median Crossover P <br />would be to turn the inside lames thrcugh the median crossover and use the exit and on ramps at <br />Wan•.apim P.cad,'Huntzinger Road for the outside lanes fat least to turn EB traffic). This would smooth <br />traffic flow and reduce some delay for a merge. <br />• WSDOT maintenance has stated that crossover median areas M and N should not be considered <br />further, Keep these areas in tFe p*t? Are improvements needed? <br />• Determr .ne xhether imprcvarrents are needed to the ot')er turnarounds that we plan to use. <br />`'egetaticn removal. pavir-g, lighting, FHA AIA approvals are in progress for rneu"'an turn around area use. <br />• Equiornent should be staged at the turnarounds to ccrtro'l traffic flow, merging to one lane on one or <br />both aides. 'a"600T will supply the traffic control equipment. Who will place the equipment? What is <br />their response time? <br />• Sign median crossover areas for j, <br />
The URL can be used to link to this page
Your browser does not support the video tag.