My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-11-13-minutes-public-works-study-session
>
Meetings
>
2023
>
11. November
>
2023-11-21 10:00 AM - Commissioners' Agenda
>
2023-11-13-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2023 2:04:24 PM
Creation date
11/16/2023 1:46:28 PM
Metadata
Fields
Template:
Meeting
Date
11/21/2023
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
111109
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
150
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Modeling of the traffic through the construction area has been performed to assess delay and queue length. <br />Summary of work zone traffic analysis is provided *rri =he to-Jies iel" fonds e>4a: ude rajcT "tclidaysjmfents). <br />Enstboun- <br />d 1.90 <br />Month <br />Time Period <br />Details <br />Mmda Queue <br />(Mlles] <br />Maximum Delay <br />(minutes) <br />Av�crape Dlverslon <br />Rater gam - 7pm <br />Giomnre�s <br />Ma,^" <br />Fi-; P'14, SU- PM <br />0.7. C.Q <br />10,13 <br />1'% <br />April <br />F•'i P. <br />.a.� <br />39 <br />7% <br />2.3 <br />29 <br />5"/a <br />1iefflO ar Da <br />Weekend <br />Fri PM <br />4.8 <br />16% <br />]une <br />•.Y 111111111111114 <br />T 1? u 5 P.M. Fri PAW <br />-Mim <br />'Ned RM <br />2.7 ,3.3 <br />3.3 <br />34, 1- <br />MN <br />41 <br />50/0, 1CC+s <br />4 6 <br />I' <br />4h of Judy (Thugs) <br />MZjOr Gorge <br />SumroerConcerhs <br />T-1y45I�i G' <br />3.�.. <br />Z2; <br />EIOs4 <br />Reeu_e6 Cir:erstcr. <br />:caie These t oerlcs <br />IVV <br />Fri PM <br />ID <br />38 <br />8% <br />Au" <br />l:rl PM <br />72 <br />17% <br />Labor Day Wkend <br />R ' :a: 3M <br />3.6 <br />76,45 <br />24%, 11% <br />St:�te-n-er <br />Fri PM <br />2.8 <br />36 <br />6% <br />Cexber <br />Fri PM <br />3.3 <br />44 <br />Wastbound I-90 <br />month <br />Tkne ftri <br />Desk <br />mad Mlm Queue Aiaximaarn Delay <br />(prilm) ' (minutm) <br />Average Diversion <br />Palau garn - 7perr <br />C1oan <br />Marcie <br />sun N <br />is <br />25 <br />4%a <br />Aphl <br />sun PM <br />3.3 <br />45 <br />12lye <br />;May <br />Sun PM <br />3.9 <br />49 <br />120ic <br />Memorial Day <br />Weekend <br />Sun PM <br />4.3 <br />16% <br />]urge <br />Sun PM <br />3.6 is <br />449"s <br />Sun RM, Mon <br />1 <br />3.0., 3.2 38; 4 _� <br />Mai" GDrge <br />Summer Concerts <br />4No. 3% <br />Reduced D'varsicr. <br />Rate Thege'o ker& <br />A* <br />sun PM <br />4.9 <br />a3 <br />19°�6 <br />August <br />sun PIM <br />5.8 <br />72 <br />250d6 <br />LabW r <br />Septernber <br />Sawn PM <br />3.1 <br />I= <br />9% <br />0,-- cMr <br />sun PM <br />35 <br />47 <br />1 12% <br />The worst queue lengths will be mitigated through construction shutdowns/suspensions as described above. <br />
The URL can be used to link to this page
Your browser does not support the video tag.