My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-11-13-minutes-public-works-study-session
>
Meetings
>
2023
>
11. November
>
2023-11-21 10:00 AM - Commissioners' Agenda
>
2023-11-13-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2023 2:04:24 PM
Creation date
11/16/2023 1:46:28 PM
Metadata
Fields
Template:
Meeting
Date
11/21/2023
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
111109
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
150
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Recently, the design team travelled to Ellensburg presenting design and modeling results <br />to the WRD, natural resource entities, and neighboring landowners. The innovative <br />design significantly improves flood protection to county residents downstream of Hanson <br />Pits. The design also improves floodplain function and creates new riparian habitat along <br />the left bank of the Yakima River between Hanson Pits and Ringer Loop. <br />PW desires to formally acknowledge the design team to BoR regional management staff. <br />PW proposes creating acknowledgment by resolution with a letter signed by the BoCC <br />for possible inclusion into the teams BoR personnel files. <br />FISCAL IMPACTS: <br />Administrative costs contained in the 2023 Flood Control Zone operational budget. <br />ATTACHMENTS: <br />None. <br />Page 2 of 2 <br />Public Works "Work Session Staff Report", 2023 <br />
The URL can be used to link to this page
Your browser does not support the video tag.