My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FP-PStacey - Task 1 PD and SD 10-27-2023 (4)
>
Meetings
>
2023
>
11. November
>
2023-11-07 10:00 AM - Commissioners' Agenda
>
FP-PStacey - Task 1 PD and SD 10-27-2023 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2023 1:21:28 PM
Creation date
11/2/2023 1:21:18 PM
Metadata
Fields
Template:
Meeting
Date
11/7/2023
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve Task Order #1 with KNIT for Design Services for Jail Updates
Order
2
Placement
Consent Agenda
Row ID
110685
Type
Agreement
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />1111 Fawcett Avenue, Suite 100 Tacoma, Washington 98402 <br />T 253.383.3257 F 253.383.3283 general@hultzbhu.com <br /> <br />October 12, 2023 <br /> <br /> <br />Knit <br />909 South 336th Street, Suite 107 <br />Federal Way, WA 98003 <br /> <br /> <br />Attention: Rhonda Gillogly <br /> <br />Subject: Kittitas County - Jail Renovations - Predesign <br /> Engineering Services Proposal <br /> <br /> <br />Dear Rhonda: <br /> <br />Thank you for this opportunity to submit our proposal to furnish engineering services for this project. <br /> <br />Project Description <br /> <br />Predesign phase for miscellaneous renovations at the Kittitas County Jail. Work involving mechanical <br />and electrical scope consist of: <br /> <br />Main Jail: <br /> Remove/replace doors (with ADA door operators) <br /> Replace fire sprinkler systems <br /> Repair dry pipe fire sprinkler system <br /> Mop Room/Kitchen-repair pipe leaks and relocate electrical items on kitchen side of wall work <br /> Recreation yard-provide new stairwell heater <br /> Recreation yard-provide new heaters in mechanical/electrical spaces <br /> Recreation-improve drainage <br /> Recreation yard-repair damaged ceilings below yards <br /> <br />Jail Annex: <br /> Install new secure enclosure at control station <br /> <br />Scope of Services <br /> <br />General: Our scope of work is for systems covered under Division 21 (fire sprinkler), Division 22 <br />(plumbing), Division 23 (HVAC), Division 26 (electrical power, lighting), Division 27 (low voltage systems), <br />and Division 28 (security, fire alarm) of the Construction Specification Institute (CSI) Manual of Practice. <br /> <br />Predesign Phase: Provide site visit to review existing conditions, develop concepts to resolve areas <br />requiring renovations, and develop cost estimates for each area of work. We will provide a written <br />narrative describing the mechanical and electrical work for each area. No design drawings are included <br />in this phase. <br />
The URL can be used to link to this page
Your browser does not support the video tag.