My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RES 2023-180
>
Meetings
>
2023
>
10. October
>
2023-10-17 10:00 AM - Commissioners' Agenda
>
RES 2023-180
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2023 1:26:50 PM
Creation date
10/24/2023 1:24:38 PM
Metadata
Fields
Template:
Meeting
Date
10/17/2023
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Item
Request to Approve a Resolution Ratifying the Chair's Signature on Community Rating System Annual Recertification Form CC-213
Order
14
Placement
Consent Agenda
Row ID
110056
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
171
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Community <br />County <br />Kittitas Co unty State WA ctD 530095 <br />Kittitas <br />CO MM U N Iry RATI NG SYSTEM ANN UAL RECERTI FICATION <br />Your community has been verified as receiving cRS credit for the following Activities.' lf your community is still implementing thJse activities the cRS .ooioinrtor is requiredto put his or her initials in the blank (d-o not use a ctreckmark o1. "n;*t and attach theappropriate items' A blank wittr no initials indicates you are not implementing thatActivity anymore, and will result in loss iip"i"i. i"nd possiblu Cns'ctass).' lf the word "attached" is u.sed you must piovide th" ,"qr".ted documentation for thatActivity' lf no documentation h'as oeen i.qrir"o ior ttrat nctivity, prl"." explain whythere is no documentation from the past year. <br />- - - <br />[ 310 EC: Wg. ar9 maintaining Elevation certificates, Floodproofing certificates,Basement Floodprooring cirtificates ano v2one design certificaies on all new con-struction and su.bstantially imn-r1ve!-puitoings in our special Flood Hazard Area(SFHA) and make copiesof all certificrt"i lu"il"ble at our present office location.t-l lnitial here is you have had no ,"i ioiitrrction or s't nstintial improvement inthe SFHA in the last year. <br />Af 310 EC: Attached e -tl" permit tist for ontystructures in the sFHA that have ueen corip@ear. we have <br />l""j]]lTr"JffiJew building and substantiaiiritou"rents in tre-srHn J"r,nn-,ir', <br />Af 310 EC: Attached are all the Gertificates for new or substantially improvedstructures that have been co.mpleted dulng this reporting period that are in-cluded on the above permit lisi. (Noie; ir,"-tot"r number oT Etevation and Flood-proofing certificates should match the numbeioi p"rmits issuec and completed withinthe reporting period defined above. All permits issued for new construction or sub-stantial improvement within the V.on" rnorio r,"u" both an rtevaiion certificate andav Zone certificate, and all buildings witn uasements within the basement exemp-tion communities should have both in grevaiion c".tin.ate ano a easement Flood-proofing Certificate). <br />E-320 Ml 1: Wg, are providing basic flood information to inquirers. we also continue toprovide the following to inquirers: <br />4L Ml 2 additionat FIRM information <br />]!f Ml 6 historicalflood informationAf Ml 7 naturalfloodplain iunctions <br />Af 320 Ml: Attached is a copy of the publicity for the credited elements of thisservice this year. <br />Community Certifications cc-213-1 Edition:2017
The URL can be used to link to this page
Your browser does not support the video tag.