Laserfiche WebLink
DCW Cost Mana@neehience power <br />Controls <br />Altemate Cost Before Markups <br />(11 EA <br />{260) SF <br />495.00 <br />5.00 <br />(4etP <br />{1,300) <br />(169,980) <br />Contingency <br />General Conditions <br />General Requirements <br />Offlce Overhead & Profit <br />Bonds and lnsurance <br />Permit <br />Escalation to Start Date (Q3 2023) <br />7.50o/o <br />6.50% <br />6.50o/o <br />5.54o/o <br />1.50o/o <br />0.00% <br />1.38o/o <br />(12,74s) <br />(11,87i\ <br />{12,649) <br />(1 1 ,39t)) <br />(3.2e0) <br />(3,052) <br />(224,S86) <br />Alternate 5: Building Option 3 - Portland Loo <br />DEDUCT <br />Comfort. Station <br />ADD <br />Portland Loo <br />Alternate Cost Before Markups <br />(1) ls 581,651,50 (5el6s?) <br />2 EA 165,000.00 330,000 <br />(251,652) <br />Contingency <br />General Conditions <br />General Requirements <br />Office Overhead & Profit <br />Bonds and lnsurance <br />Permit <br />Escalation to Start Date (Q3 2023) <br />7.50o/o <br />6.50% <br />6.50% <br />5.50% <br />1.5Ao/o <br />0.0070 <br />1,38% <br />(18,874i <br />i17,58tt <br />(18,t2/, <br />ir 6,876i <br />i4,8Sil j <br />(4,:;18) <br />(333,086)