Laserfiche WebLink
DCW Cost Management <br />City of Ellensburg <br />Unity Park <br />50% Construction Docunrents Cost Plan May 2,2023 15 <br />Alternate 't: Curved wall at in lieu of concrete) <br />DEDUCT <br />Concrete wall - curved <br />ADD <br />Brick wall - cr.rrved, 10' ht. <br />Concrete wall - curved, 18" hi. <br />Altemate Cost Before Markups <br />Contingency <br />General Conditions <br />General Requirements <br />Office Overhead & Profit <br />Bonds and lnsurance <br />Permit <br />Escalation to Start Date (Q3 2023) <br />863 SF i37 .a,a) (s8,219) <br />75A <br />442 <br />CE <br />bt- <br />55.00 <br />67.50 <br />41 ,250 <br />7,554 <br />/,1,\ OAO\ <br />7.50Vo <br />6.50% <br />6.50% <br />5.50% <br />1.50a/o <br />1.38Yo <br />(\ t7.i: <br />a'i ili_il <br />'.'t."4:3't <br />:,': 't,l,ti\ <br />(':)t') <br />by Owner <br />iiij5; <br />{?2,460)