Laserfiche WebLink
4.1,2 Continue to pttrsue and promote upper floor mixed-use development. Higlt priority. <br />The private sector opportunities are shown in three categories in Figure 9 on the following page: <br />complete, in progress, and opportutity sites/buildings. There are nine opporrunity buildings and <br />one opportunity site and each is fuither explored either explicitly or tnore generally depending on <br />the nahre of the building or site. Eilensburg should consider-an oprn hor.*" "live iowntown" <br />event to promote downtown residential development opportunities, The event should be an open <br />house of existing residential units in downtown to sho* both potential residents and developer-s <br />the potential for additional living in the communify. Many plople simply haven,t experienced <br />what downtown living can be like. Sorne communities have even done "mock" upper floor <br />housing with fumishings from local decorators to showcase what downtown living "oild b.lik. <br />in a particular buiiding. <br />4.1.3 l{ork to buikl Ellensburg Gateway at cot ner of Main and Third. Medium priofity. <br />Currently the comer of 3'd Avenue and Main Street is an existing parking lot paved with concrete <br />pavers' Figure 9 shows that the same number of par-king spaces can be moved to be on streetpalking, opening up the area for outdoor dining und an uttru.tiv" clowntown gateway sign at the <br />northeast colner of the intersection. The restrooms at the southwest corner of the intersection <br />should be relocated to the center of town as outlined in recommendation 4.1.1 abo'i,e, <br />27