My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Signed Internal Op Contract
>
Meetings
>
2023
>
10. October
>
2023-10-17 10:00 AM - Commissioners' Agenda
>
Signed Internal Op Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/12/2023 1:50:51 PM
Creation date
10/12/2023 1:50:23 PM
Metadata
Fields
Template:
Meeting
Date
10/17/2023
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve a Resolution Authorizing Amendment of the 2023 Operational Agreement Between Kittitas County and the Kittitas Valley Event Center
Order
10
Placement
Consent Agenda
Row ID
110056
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t_f-cc*k)r 5 A3 <br />Signatu of Official resentative Title Date <br />Tou rism-Related, Smal l-Sca le M unicipa lity-Owned Ca pital project Bu dget <br />All applicants for capital project funding must supply a detailed and complete project budget <br />utilizing the following basic format: <br />Funding Sources <br />Lodging Tax Funds Request <br />*Other Grant Funds <br />List By Source (indicate if secured or applied)*Other Local Government Funds <br />List By Source <br />*Private Funds <br />List By Source (may include in-kind) <br />Total Available Funding <br />Project Expenses <br />Real Property or "Right-of-Way" Acquisition Cost <br />Capital Asset Cost <br />Construction Cost or "Hard" Cost <br />lnclude an itemized list of general costs <br />For example: asset type and cost, site prep, building foundation and structure, <br />mechanicalwork, finish work, site restoration, electrical work, technology, etc. <br />Soft Cost <br />lnclude an itemized list of soft costs <br />For example: design fees, construction management fees, survey costs, <br />engineering fees, permitting costs, special inspections, cultural resource surveys, <br />etc. <br />Total Project Costs <br />*Verifying documentation must be provided and attached to this budget. This documentation <br />may include award letters, letters of commitment, or loan approval documentation. you must <br />include this in order to meet the matching funds requirement. lf the funding source includes <br />applicant funds, proof of available funding in the form of a letter of commitment from an <br />authorized body or representative of the applicant is adequate. <br />9
The URL can be used to link to this page
Your browser does not support the video tag.