Laserfiche WebLink
9/27/23, 11:34 AM newspaper -text (15).html <br />Public Notice <br />Kittitas County, Ellensburg WA <br />STATEMENT OF QUALIFICATIONS (SOQ) <br />TO PROVIDE PROFESSIONAL ARCHITECTURAL AND ENGINEERING SERVICES FOR FIRE STATION <br />FLOODPLAIN COMPLIANCE <br />IN KITTITAS COUNTY, WASHINGTON <br />All submittals received after 5:00 PM, local time, October 27, 2023, will be discarded. <br />PURPOSE: <br />The Kittitas County Flood Control Zone District is requesting Statements of Qualifications from qualified firms interested in <br />providing professional architectural and engineering services to bring an existing fire station into compliance with National <br />Flood Insurance Program building standards. <br />SCOPE OF WORK: <br />Professional architectural and engineering services are needed to identify alternatives, evaluate feasibility, and provide cost <br />estimates for options to bring an existing fire station into compliance with National Flood Insurance Program building <br />standards. The selected firm will work with Fire District and Flood Control Zone District staff to understand facility needs <br />and permitting requirements for the structure. The alternative analysis should consider both building retrofit and building <br />relocation options. <br />PROCEDURES FOR SUBMITTAL: <br />If you wish to be considered for work under this Statement of Qualifications (SOQ), you must be a registered consultant on <br />the Municipal Research and Service Center of Washington — Shared Small Works and Consultant Roster <br />(www.mrscroster.org). <br />To respond to this solicitation to provide Professional Architectural and Engineering Services for Fire Station Floodplain <br />Compliance, submit a sealed envelope with three (3) printed copies of the SOQ to Ms. Candle Leader, Administrative <br />Supervisor, at 411 N. Ruby St. Suite 1, Ellensburg WA 98926, no later than 5:00 PM on October 27, 2023. Failure to adhere <br />to submittal requirements allows for disqualification. <br />For your records, the County will provide a confirmation email to the contacts provided in the submittal confirming receipt <br />of your interest in the proposal. Submittals received after 5:00 PM local time October 27, 2023, will be disregarded. The <br />County reserves the right to reject one or more submittals. <br />To facilitate review, SOQ submittals shall conform to the following format. <br />1. Experience and Qualifications: Provide a description of your frrm's experience and qualifications in designing <br />facilities to meet National Flood Insurance Program building standards for structures located within a Special Flood <br />Hazard Area. This description should include experience providing engineered flood proofing and fire station <br />architectural services. <br />2. Project Team: Identify proposed team members and responsibilities. Provide individual resumes, outlining <br />credentials and experience, and a statement about the availability and commitment of the proposed team members to <br />complete the contract. <br />3. References: Provide the name and phone number for at least three (3) references of past clients in relation to projects <br />similar to those in the above Scope of Work definition. <br />4. Project Understanding: Identify the approach that will be taken to meet the scope of work. Identify any special <br />considerations for fire station facilities, facilities within a Special Flood Hazard Area, and retrofits of existing <br />structures to meet National Flood Insurance Program building standards. <br />Responders are directed as follows: <br />• The maximum number of pages (double -sided) is ten and shall be 12-point font — including all graphics. <br />• A cover letter may be provided in addition to the ten -page (double sided) limit. <br />file:///C:/Users/candie.leader/Downloads/newspaper-text (15).html 1/3 <br />