My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RES-2023-152
>
Meetings
>
2023
>
09. September
>
2023-09-05 10:00 AM - Commissioners' Agenda
>
RES-2023-152
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2023 11:17:36 AM
Creation date
9/12/2023 11:17:31 AM
Metadata
Fields
Template:
Meeting
Date
9/5/2023
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Item
Request to Approve a Resolution to Award the Contract for the Faust Road Bridge #88212 Over the Town Ditch Replacement Project (CRP 316-22) and Authorize the County Engineer to Execute the Same
Order
23
Placement
Consent Agenda
Row ID
108557
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TO: <br />^-.w lltllashington State <br />Department of Transportation <br />Memorandum <br />Jacki Doty <br />Transportation Engineer 4 <br />THRU:Nina Jones <br />Business Diversity & lnclusion Manager <br />FROM:Rosa Covarrubias <br />DBE Compliance Enforcement Lead <br />SUBJECT: Contract 2019(033)-1 Faust Rd Bridge <br />REGUTATION: CFR 49 Part 26, Appendix A <br />WSDOT General Special Provisions <br />TECHNICAL ELEMENTS: <br />Condition of Award Goal: L5% <br />Advertisement Date : 07 / 27 / 2023 <br />Bid Openi ng Date: O8/ L7 / 2023 <br />Project Engi neer Cost Estimate: S1,636,016. 50 <br />OVERVIEW: <br />The WSDOT General Special Provisions state CFR 49, Part 26, Appendix "A" and are part of the contract <br />and bid documents. <br />On August 23,2023, the Washington State Department of Transportation, Office of Equity & Civil Rights, <br />was asked to conduct a "Good Faith Effort" review on the submittal of Good Faith Effort documentation <br />submitted by Belsaas & Smith Construction about the above project. <br />When an FHWA federal-aid contract has an established Condition of Award (COA) goal, the bidder must <br />make a "Good Faith Effort" to meet the goal. The agency identified placed a COA goal of fifteen percent <br />(15%) on this project. <br />ANALYSIS: <br />Note: To subjectively determine whether the bidder meets the requirements of CFR 49 Part 25.53, the review <br />followed the established procedures in Appendix "A" of CFR 49 Part26. <br />Besides the appendix, OECR reviewed the supplemental bid documentation the bidders can provide <br />within 48 hours of bid time. Within 48 hours, the bidder added DBE supplier, The Bag Lady, for 54703 <br />and DBE subcontractor, Caliber Traffic Solutions LLC for 532,560. The supplemental letter also mentions <br />that they have contacted DBE subcontractor Gilbert Patterson Concrete to provide a quote for the deck <br />slab.
The URL can be used to link to this page
Your browser does not support the video tag.