Laserfiche WebLink
ITEM <br />EXHIBIT "A' <br />SCOPE OF WORK and COST ESTIMATE <br />City of Rorlyn <br />Cem.tcry lrrlgatlon Systcm <br />PrG-Constructlon .nd construction <br />Enilnccr'r Estimatc <br />UNIT UNIT PRICE QUANTITY COST <br />Plannlng <br />Design-Contractor Procurement <br />Mobilization and Demobillzatlon <br />Temporary Traffic Control <br />Trench Excavation Safety <br />Erosion Control Measures <br />6-inch PVC w/bedding material <br />2-inch PVC w/beddlng material <br />Trench Backflll <br />Main Fittlngs <br />5-inch Gate Valves <br />Double Check Valves <br />Hydrant Assembly <br />Connection to Exlstlng Water Maln <br />Slte Restoration <br />HMA Repalr <br />L5 <br />ts <br />LS <br />LS <br />LS <br />LS <br />LF <br />LF <br />CY <br />LS <br />EA <br />EA <br />EA <br />EA <br />L5 <br />5F <br />57,s4s <br />58,7s0 <br />ss,o0o <br />Ssoo <br />ssoo <br />Sr,soo <br />5qz <br />Szs <br />Soo <br />s2,s0o <br />S1,3oo <br />$8,100 <br />94,500 <br />S2,ooo <br />s1,soo <br />SS <br />1 <br />1 <br />1 <br />L <br />I <br />1 <br />2265 <br />1645 <br />75 <br />1 <br />6 <br />2 <br />2 <br />2 <br />1 <br />750 <br />S7,s4s <br />58,7s0 <br />S5,ooo <br />Ssoo <br />$500 <br />s1,5oo <br />5r06,4ss <br />54t,t2s <br />s4soo <br />s2,soo <br />S7,8oo <br />$1o,2oo <br />s9,ooo <br />s4ooo <br />51,soo <br />Sg,zso <br />E3timltc Subtot.l: <br />X5% Contigencyl <br />Estlmatcd Srlcs Tax rt 8%: <br />$220,625 <br />Ss3,oe4 <br />$20,298 <br />TotrlEetimatG; $274,oL6 <br />- Assume existing natlve soils are largely acceptable for trench backflll. <br />- Actual Construction Costs may vrry based on the Contractor, Supplier, and unexpected sitc <br />condltlons. <br />Page 4 of 5