Laserfiche WebLink
CB EI^ECTSIC LIG <br />fsolrE 509-?26{r4U <br />rrtX509-r9r{4gg <br />July212,2023 <br />ELECTRICAL CHANGE ORDER <br />TO: CONCORDCONSTRUCTTON <br />WAPATO, wll <br />JOB: BLOOM PAVIUON <br />ELLENSBURG, WA <br />ECOP.0 <br />SUBJEGT: TEUP GERT OF OCCUPANCY <br />CB Electric is providing a change order proposal to providc and install a new 2fi) Amp Main <br />Lug Load cenrcr with 12 1P-20A breakers. we will be remporary hooking up 3 new plug <br />circuits, 2 new lighting circuits, 4 exhaust fan circuir, and I exterior ligbting circuir <br />Material <br />Labor <br />P&OH: <br />$ n4.w <br />$ 1,892.00 <br />$ 429.n <br />Total N)D: $ 3,095.00 <br />Exclusions: Sales tax, performance bond, excavation, bedding, baclcfill concrcte & asphalt <br />cutting & parching. <br />zlq <br />WWW.CBELECTRICYAKIMA.COM PO BOX 8056 YAKIMA, WA 98908 LIC* CBELEETSS1PS