Laserfiche WebLink
CBEIEGTilCI^LG <br />PtrOnE 50ryr60tr? <br />frxso*'rgr{lst <br />July ll,2023 <br />ELECTRIGAL CHANGE ORDER <br />TO: CONGORDCONSTRUCTION <br />WAPATO, WA <br />JOB: BL(X)il PAVIUON <br />ETLENSBURG, WA <br />ECOP 3 <br />SURIEGT: IIIDP BREAKER ADDITION <br />CB Elaric is providing a change orderproposal to provide and install I new 3P-200Amp <br />breaker and associated hardware in the existing MDP panel to feed our new panel. The existing <br />brealcer that was supposed to be used was a 2P breaker and not the needed 3P. <br />Materid <br />Labor <br />P&OH: <br />$ 2598.00 <br />$ 132.00 <br />$ 423.00 <br />Total ADD: i 3,f53.00 <br />Exclusions: Sales tax, performancc bond, excavation, bedding, backfill concr€tc & asphalt <br />cutting & patching. <br />www.cBEtEcrBlcYAKrMA.COM PO BOX 8056 YAK|MA WA 98908 uC S CBELEELS6IPS