My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Signed Change Order 4 for Bloom Pavillion
>
Meetings
>
2023
>
09. September
>
2023-09-05 10:00 AM - Commissioners' Agenda
>
Signed Change Order 4 for Bloom Pavillion
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2023 10:58:25 AM
Creation date
9/12/2023 10:58:13 AM
Metadata
Fields
Template:
Meeting
Date
9/5/2023
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Item
Request to Approve Change Order 4 with Concord Construction Inc. for Bloom Pavilion Addition
Order
11
Placement
Consent Agenda
Row ID
108557
Type
Agreement
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CBEIEGTilCI^LG <br />PtrOnE 50ryr60tr? <br />frxso*'rgr{lst <br />July ll,2023 <br />ELECTRIGAL CHANGE ORDER <br />TO: CONGORDCONSTRUCTION <br />WAPATO, WA <br />JOB: BL(X)il PAVIUON <br />ETLENSBURG, WA <br />ECOP 3 <br />SURIEGT: IIIDP BREAKER ADDITION <br />CB Elaric is providing a change orderproposal to provide and install I new 3P-200Amp <br />breaker and associated hardware in the existing MDP panel to feed our new panel. The existing <br />brealcer that was supposed to be used was a 2P breaker and not the needed 3P. <br />Materid <br />Labor <br />P&OH: <br />$ 2598.00 <br />$ 132.00 <br />$ 423.00 <br />Total ADD: i 3,f53.00 <br />Exclusions: Sales tax, performancc bond, excavation, bedding, backfill concr€tc & asphalt <br />cutting & patching. <br />www.cBEtEcrBlcYAKrMA.COM PO BOX 8056 YAK|MA WA 98908 uC S CBELEELS6IPS
The URL can be used to link to this page
Your browser does not support the video tag.