Laserfiche WebLink
DCW Cost ivlanagement <br />City of Ellensburg <br />Unity Park <br />nl^...--r-l\u vvur t\ dr il.tutl.rdLcu <br />50% Construction Documents Cost Plan May 2,2A23 I <br />3"890Demo - rnigation <br />Demo - tree <br />Demo - light poles <br />Demo - utilities, incl. power and telephone services <br />Demo - storm sump pump <br />Demo - storm syslem <br />Demo - cap existing services for reuse (water and selver) <br />Demo - woocl paviiion, incl. conc steps and conc wal! <br />Salvage and relocate - bull statue <br />Salvaqe - bell tower <br />Salvage - wind sculptures <br />Salvage - basalt columns and boulders <br />Saivage - bench <br />Salvage - metal pedestal <br />Salvage - wall plaques <br />Sai,iage - iigiri pr"rie <br />Salvage - flaq pole <br />Salvage - signage <br />G1030 Site Earthurork <br />Site cut - 1' depth <br />l-laul and dispose <br />Fill - stockpile, assume 20% <br />Graciing anci contouring <br />Base aggregates <br />ec <br />EA <br />EA <br />LS <br />o <br />4 <br />1 <br />0.1 5 <br />550.00 <br />850.00 <br />15.000.00 <br />troA <br />4 qqn <br />3,400 <br />15,000 <br />;^^t ^L^..^ <br />incl. above <br />incl. above <br />0,/uo <br />1,700 <br />1 tnn <br />2,250 <br />2,000 <br />4,!00 <br />250 <br />400 <br />2,1 00 <br />2,400 <br />2,000 <br />905 SF <br />1EA <br />I trA <br />3EA <br />1LS <br />14 EA <br />'1 trA <br />.) rn <br />2EA <br />3EA <br />1LS <br />7.50 <br />1,700.00 <br />1 'nn nn <br />7s0 00 <br />2,000.00 <br />350.00 <br />250.00 <br />200.00 <br />1,050.00 <br />800.00 <br />2,000.00 <br />BO4 CY <br />644 CY <br />161 CY <br />2i,121 SF <br />'\it <br />"-V <br />'i6,090 <br />14,'159 <br />1,931 <br />7,602 <br />NIC <br />20.00 <br />22.00 <br />12.A0 <br />0.35 <br />55.00 <br />C1hAfi r].azcrrlnr rc \l/acro t?ama.licrinn <br />- New Ccrnstruction <br />Quar8ily Unrt Rate lsul <br />G20 Site 22,811 SF 64.',17 1,463,865 <br />G20i0 Roadways <br />Demolition <br />Demo - brick, incl. subgrade materials <br />Sawcut <br />Demo - curb <br />Pothole existing sewer <br />Site prep and earthwork <br />Tree protection <br />Site and utility protection <br />Site cut - 1' depth <br />Haul and dispose <br />675 <br />310 <br />98 <br />1 <br />5r <br />LF <br />LF <br />LOC <br />3,038 <br />n caF <br />882 <br />2,500 <br />4.50 <br />/.cu <br />9.00 <br />2,500.00 <br />5EA <br />1LS <br />40 CY <br />32 CY <br />750.00 <br />3,500.00 <br />20.00 <br />22.40 <br />3,750 <br />3,500 <br />807 <br />711