My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RES-2023-154
>
Meetings
>
2023
>
09. September
>
2023-09-11 1:30 PM - Public Works Study Session
>
RES-2023-154
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/16/2023 8:02:48 PM
Creation date
9/11/2023 2:04:26 PM
Metadata
Fields
Template:
Meeting
Date
9/11/2023
Meeting title
Public Works Study Session
Location
BoCC Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AdIbL <br /> WrWashington State Local Agency Federal Aid <br /> Af Department of Transportation Project Prospectus <br /> p <br /> 1 Prefix Route ( ) Date 8/31/2023 <br /> Federal Aid DUNS Number 01-020-2547 <br /> Project Number <br /> Local Agency RC2296 WSDOT Federal Employer 91-601349 <br /> Project Number Use Only Tax ID Number <br /> Agency CAAgency Federal Program Title <br /> Kittitas County Public Works Yes ❑ No Z 20.205 [:] Other STBG(R) <br /> Project Title Start Latitude N 46.999658 Start Longitude W-120.512097 <br /> Vantage Highway Paving End Latitude N 47.000621 End Longitude W-120.411552 <br /> Project Termini From-To Nearest City Name Project Zip Code(+4) <br /> 2.027 6.570 Ellensburg 98926-9081 <br /> Begin Mile Post End Mile Post Length of Project i Award Type <br /> 2.027 6.570 4.543 0 Local❑Local Forces❑State❑Railroad <br /> Route ID Begin Mile Point End Mile Point City Number County Number County Name <br /> 2.027 6.570 -�_ 19 Kittitas <br /> WSDOT Region T <br /> gislative District(s) Congressional District(s) Urban Area Number <br /> South Central Region3 _ , 8 <br /> Total I Local Agency Phase Start <br /> Phase Estimated Cost I Funding Federal Funds Date <br /> Nearest Hundred Dollar Nearest Hundred Dollar Nearest Hundred Dollar Month_ Year <br /> P.E. <br /> R/W <br /> Const. 3,950,000 533,300 3,416,700 September 2023 <br /> Total 3,950,000 533,300 3,416,700 <br /> Description of Existing Facility (Existing Design and Present Condition) <br /> Roadway Width Number of Lanes <br /> 28' -42' 2 - 3 <br /> Existing roadway structure is failing and in need of rehab. <br /> Description of Proposed Work _ <br /> Description of Proposed Work(Attach additional sheet(s)if necessary) <br /> Grind and overlay of asphalt on Vantage highway within the existing pavement limits along with temporary <br /> and permanent pavement marking for repair,rehabilitation and preservation. <br /> Local Agency Contact Person Title Phone <br /> Darren Case Construction Manager 509-962-7019 <br /> Mailing Address City State Zip Code <br /> 411 N. Ruby, Suite 1 Ellensburg WA 98926 <br /> By , <br /> Project Prospectus Approving Authority <br /> Title County EngineerIDat_ e A)rl Z� <br /> DOT Form 140-101 Page 1 <br /> Revised 01/2022 Previous Editions Obsolete <br />
The URL can be used to link to this page
Your browser does not support the video tag.