My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-07-10-minutes-cds-study-session
>
Meetings
>
2023
>
09. September
>
2023-09-05 10:00 AM - Commissioners' Agenda
>
2023-07-10-minutes-cds-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2023 1:17:31 PM
Creation date
8/31/2023 1:13:49 PM
Metadata
Fields
Template:
Meeting
Date
9/5/2023
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
108557
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2) Implement the VSP work plan, including implementing the requirements of the VSP <br />and RCW Chapter 36.70A.700-760. <br />A. Two-year status reports. No later than August 30, 2023, provide the written <br />biennial report to the COMMISSION. The biennial report must provide the status <br />of plans and accomplishments of the work plan to COMMISSION. The biennial <br />report should include a summary of how plan implementation is affecting each <br />of the following: <br />1) The protection and enhancement of critical areas within the area where <br />agricultural activities are conducted; <br />2) The maintenance and improvement of the long-term viability of agriculture; <br />3) Reducing the conversion of farmland to other uses; <br />4) The maximization of the use of voluntary incentive programs to encourage <br />good riparian and ecosystem stewardship as an alternative to historic <br />approaches used to protect critical areas; <br />5) The leveraging of existing resources by relying upon existing work and plans <br />in counties and local watersheds, as well as existing state and federal <br />programs to the maximum extent practicable to achieve program goals; <br />6) Ongoing efforts to encourage and foster a spirit of cooperation and <br />partnership among county, tribal, environmental, and agricultural interests <br />to better assure the program success; <br />7) Ongoing efforts to improve compliance with other laws designed to protect <br />water quality and fish habitat; and <br />8) A description of efforts showing how relying upon voluntary stewardship <br />practices as the primary method of protecting critical areas and does not <br />require the cessation of agricultural activities. <br />B. Five-year review and evaluation report. If a Five-year VSP report is due during <br />this contract period, then no later than the current deadline for submittal of the <br />report to the COMMISSION, and in conjunction with the county watershed <br />group, facilitate, develop, assist and submit the five-year report to the director <br />of the COMMISSION. See RCW 36.70A.720 (2) (b) (i) and (c) (i). When submitting <br />the five-year review and evaluation report to the COMMISSION, as per RCW <br />36.70A.720 and RCW 36.70A.730, the COUNTY agrees to use the COMMISSION'S <br />Guide and Template. The Guide is available for download on the COMMISSION's <br />VSP 2023-25 Biennium Contract Between the WSCC and County - Page 17 of 21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.