My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-08-14-minutes-public-works-study-session
>
Meetings
>
2023
>
09. September
>
2023-09-05 10:00 AM - Commissioners' Agenda
>
2023-08-14-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2023 1:26:24 PM
Creation date
8/31/2023 1:13:49 PM
Metadata
Fields
Template:
Meeting
Date
9/5/2023
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
108557
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SYSTEM DESIGN AND OPERATION <br />Section Required information Reference(s) <br />6 9 j Provide a description of the existing water supply system from the point of <br />diversion or withdrawal to the place of use. <br />I Provide preliminary design plans and specifications for the proposed change, <br />6.10 <br />! including diversion or withdrawal and conveyance facilities, if applicable, and <br />the proposed flow rate and volume design capacity. <br />6.11 <br />For change Proposals adding a Purpose of use or adding irrigated acres, <br />describe how the change proposal would affect return flow. <br />6.12 <br />Provide the current and projected system efficiency covered by the water right <br />proposed for change. <br />6.13 <br />Provide an explanation of how the proposed use will not increase the <br />PRO 1210 <br />authorized maximum flow rate (Qi) or annual volume (Qa). <br />GUID 1210 <br />6.14 <br />For surface water diversions, describe how your plans comply with WDFW <br />RCW 77.57 <br />fish screening requirements. <br />DEVELOPMENT SCHEDULE <br />Section <br />Required information <br />6.15 <br />Provide a general timeline that includes the steps needed to begin the project, <br />complete the project, and put the water to full beneficial use. <br />6.16 <br />For chan es to water rights currently under a development schedule, <br />provide a description of the current status of your project. <br />6.17 <br />I Identify and discuss other land -use or environmental permits required and the <br />timeline to obtain those permits. <br />7. Related Water Rights <br />Section <br />Required information <br />Reference(s) . <br />7.1 <br />List any other water rights (applications, permits, certificates, or claims) related <br />to this change application. Include any rights that overlap the place of use. <br />+ <br />7.2 <br />Explain how the water rights listed above have been exercised.1260 <br />s <br />7.3 <br />List all wells that have been added through a Showing of Compliance form. <br />POL <br />ECY 040-40- 74 f <br />8. Historical Use <br />Section Required information <br />8.1 Describe how the water proposed for change has been beneficially used since <br />the water right was established. <br />ECY 040-1-14 (Rev 03-2021) Page 7 of 16 <br />