My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-08-14-minutes-public-works-study-session
>
Meetings
>
2023
>
09. September
>
2023-09-05 10:00 AM - Commissioners' Agenda
>
2023-08-14-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2023 1:26:24 PM
Creation date
8/31/2023 1:13:49 PM
Metadata
Fields
Template:
Meeting
Date
9/5/2023
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
108557
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONTACT (IF DIFFERENT FROM ABOVE) <br />PHONE NO. <br />ALT PHONE NO. <br />Tyson D Carlson <br />1509-895-5923 <br />206-696-1525 <br />' ADDRESS <br />1106 N 35th Ave <br />CITY <br />STATE <br />ZIP CODE <br />Yakima <br />WA <br />�98902 <br />EMAIL ADDRESS (IF AVAILABLE) <br />tcarlson@aspectconsulting.com <br />3. Purpose(s) and Period of Use <br />A. Existing <br />PURPOSE OF USE GPM or CFS ACRE-FTNR PERIOD OF USE <br />Irrigation of 56 acres 4.33 1,075.2 April 1 to October 15 <br />Stockwater 0.03 3 February 1 to November 30 <br />B. Proposed (if different from 3A) <br />PURPOSE OF USE GPM or CFS ACRE-FTNR PERIOD OF USE <br />Instream Flow and Mitigation 4.36 1078.2 April 1 to October 31 <br />4A. Existing Locations of Point(s) of Diversion or Withdrawal <br />Describe your existing water use in Section 4A: source description, and either surface water or groundwater. <br />Describe your proposed water use in Section 4B: source description, and either surface water or groundwater. <br />Refer to accompanying guidance document for more information. Attach additional sheets if needed. <br />Source Name Source Location Information (Legal Description) <br />SOURCE NAME QTR i <br />i (Reference by number below) QTR QTR SEC TWP RGE PARCEL NO. <br />1. Reecer Creek (Figure 1) SE NE 28 18 N 18 E 621033 <br />! 2. I 1 <br />3. <br />4. <br />Complete one of the following tables: A) for surface water, or B) for groundwater <br />A) For existing surface water diversions <br />❑ SPRING © CREEK ❑ RIVER ❑ LAKE ❑ OTHER: <br />SOURCE from GPSI <br />4A above TRIBUTARY TO: LAT-LONG <br />1. Yakima River 47.023672°,-120.586649' i <br />2. <br />3. <br />4. <br />DO YOU OWN THE POINT(S) of DIVERSION? ❑ YES ❑■ NO <br />ECY 040-1-97 (Rev 03-2021) Page 3 of 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.