My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-08-14-minutes-public-works-study-session
>
Meetings
>
2023
>
09. September
>
2023-09-05 10:00 AM - Commissioners' Agenda
>
2023-08-14-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2023 1:26:24 PM
Creation date
8/31/2023 1:13:49 PM
Metadata
Fields
Template:
Meeting
Date
9/5/2023
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
108557
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KITTITAS COUNTY <br />DEPARTMENT OF PUBLIC WORKS <br />PUBLIC WORKS — BOARD OF COUNTY COMMISSIONERS <br />STUDY SESSION STAFF REPORT <br />STUDY SESSION DATE: August 14, 2023 <br />TOPIC: Hyak Drive East <br />ACTION REQUESTED: Informational — No Board action required <br />LEAD STAFF: <br />Joshua Fredrickson <br />RECONLMENDATION: <br />Informational briefing — no Board of County Commissioners (BoCC) action is required. <br />BRIEFING SUMMARY: <br />• Auditor File Number 462834 deeded right-of-way from Kittitas County Sewer <br />District No. I to the County for the southern portion of Hyak Drive East. <br />• Various roads in Hyak were improved through a Road Improvement District <br />(RID) completed in the early 1990's. <br />• 1996 Resolution approved to bring RID roads in Hyak onto the County system. <br />• Resolution 2012-010 brought a segment of Hyak Drive East onto the County <br />system. <br />• Resolution 2013-121 brought the existing turn -around onto the County system. <br />• Deeded section of Hyak Drive East is not an on -system road (unopened county <br />right of way). <br />BACKGROUND: <br />In 1982 Kittitas County Sewer District No. 1, the predecessor to Snoqualmie Public <br />Utility District (SPUD), deeded to Kittitas County a portion of property for right-of-way. <br />This right-of-way extends from Hyak Drive East to national forest lands. As development <br />continued in the area the County established a Road Improvement District (RID) to make <br />improvements to various roadways in the Hyak area. These roads were brought onto the <br />County Road system through resolution. The County built a shop at the paved end of <br />Hyak Drive East, along with a turnaround at the county shop. SPUD has constructed <br />facilities along the section of right-of-way deeded to the County. <br />DISCUSSION: <br />The paved portion of Hyak Drive East receives regular maintenance and snow plowing, <br />as it is an on -system roadway. This road segment serves the County/SPUD joint use <br />maintenance shop. During winter months a gate is closed at the end of the pavement <br />where a turnaround exists, preventing vehicles from continuing to Forest Service Road <br />9070. The County has right-of-way deeded for approximately 785 feet south of the <br />existing turnaround. The right-of-way continues to the FS road. There is not a turn around <br />Page 1 of 4 <br />Public Works "Work Session Staff Report" 2023 <br />
The URL can be used to link to this page
Your browser does not support the video tag.