Laserfiche WebLink
<br />Professional Services Agreement (rev. 09/24/2018) <br />Page 14 of 17 <br />EXHIBIT "B" <br /> <br /> COMPENSATION <br /> <br />As full compensation for satisfactory performance of the work, the County shall pay <br />Contractor compensation not to exceed: <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />QTY Unit Price Total <br />Item 1 Mobilization 1 7625.00 7625.00 <br />Item 2 Removal of Structures and Obstructions 1 5000.00 5000.00 <br />Item 3 Pavement Excavation Incl. Haul 230 100.00 23000.00 <br />Item 4 Crushed Surfacing Base Course 75 100.00 7500.00 <br />Item 5 Asphalt for Fog Seal 0.5 12000.00 6000.00 <br />Item 6 Commercial HMA 40 200.00 8000.00 <br />Item 7 Inlet Protection 1 150.00 150.00 <br />Item 8 Rock Mulch 2"-4"2 200.00 400.00 <br />Item 9 Extruded Curb 42 65.00 2730.00 <br />Item 10 Paint Lines 1000 1.50 1500.00 <br />Item 11 Painted Access Prking Space Symbol 2 150.00 300.00 <br />Item 12 Painted No Parking Symbol 3 175.00 525.00 <br />Item 13 Cement Concrete curb ramp 1 3500.00 3500.00 <br />Item 14 Chain link fence 110 85 9350.00 <br />Item 15 End gate, cornern and pull post for fenc 4 300.00 1200.00 <br />Item 16 Adjust Manholes 2 1000.00 2000.00 <br />Item 17 Cleaning Existing Drainage Structures 1 1500.00 1500.00 <br />Item 18 Flag Pole and Foundation 1 5000.00 5000.00 <br />Item 19 Subgrade repair 1 10000 10000 <br />Total $95,280.00