Laserfiche WebLink
7/24/2023 12:20:01 PM <br />BLOOM TEMPORARY POWER TO OPEN <br />Job Number: 1000015592 <br />Extension By Phase <br />Item # Description Quantity Price U <br />- 01 Underground Feeder Raceway - <br />1001 <br />3/4" EMT <br />4 <br />120.75 C <br />1437 <br />314" Set Screw Steel Conn <br />8 <br />171.88 C <br />1502 <br />2-1/2" Comp Steel Insul Throat Conn <br />2 <br />18.39 E <br />1557 <br />3/4" Set Screw Steel Cplg <br />0 <br />74.75 C <br />2279 <br />3/4" 1-Hole Strap <br />1 <br />17.25 C <br />- 01 Underground Feeder Raceway Total - <br />- 02 Underground Branch Raceway - <br />2790 <br />#12 THHN CU Stranded Wire <br />13 <br />224.23 M <br />- 02 Underground Branch Raceway Total - <br />- 03 Above Ground Feeder Raceway - <br />TEMP <br />200 Amp Surf Load Center-Nema 1 <br />1 <br />506.00 E <br />- 03 Above Ground Feeder Raceway Total - <br />-09Trim - <br />54646619 <br />200 AMP PANEL DEMOLITION <br />1 <br />11.50 E <br />- 09 Trim Total - <br />- 13 Rough -In - <br />19444 <br />3/4" GRC Coupling <br />5 <br />338.05 C <br />-13 Rough -In Total - <br />- 18 Misc. - <br />54655091 <br />2 1/2" GRC COUPLING <br />1 <br />30.48 E <br />T0001 <br />REMOVE PIPES AND CIRCUITS <br />1 <br />0.00 E <br />T0003 <br />200 AMP PERMIT <br />1 <br />150.42 E <br />-18 Misc. Total - <br />Job Total <br />Nay <br />' Target, Labor column 2 <br />Page 1 <br />Ext Price Labor Hr U Ext Lab Hr <br />4.83 <br />2.70 C <br />0.11 <br />13.75 <br />0.07 E <br />0.56 <br />36.78 <br />0.46 E <br />0.92 <br />0.30 <br />0.07 E <br />0.03 <br />0.09 <br />2.63 C <br />0.01 <br />55.75 <br />1.63 <br />2.83 <br />6.33 M <br />0.08 <br />2.83 <br />0.08 <br />506.00 <br />9.78 E <br />9.78 <br />506.00 <br />9.78 <br />11.50 <br />4.03 E <br />4.03 <br />11.50 <br />4.03 <br />16.90 <br />0.07 E <br />0.35 <br />16.90 <br />0.35 <br />30.48 <br />0.17 E <br />0.17 <br />0.00 <br />2.88 E <br />2.88 <br />150.42 <br />0.00 E <br />0.00 <br />180.90 <br />3.05 <br />773.88 18.92 <br />