My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KVEC Capital Outdoor LED Lighting
>
Meetings
>
2023
>
09. September
>
2023-09-05 10:00 AM - Commissioners' Agenda
>
KVEC Capital Outdoor LED Lighting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2023 1:10:49 PM
Creation date
8/31/2023 1:07:59 PM
Metadata
Fields
Template:
Meeting
Date
9/5/2023
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve a Resolution Adopting the Distribution of the 2023 Tourism-Related, Small-Scale Municipality-Owned Capital Projects Grant Funds
Order
6
Placement
Consent Agenda
Row ID
108557
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J-Y 5 A 3 <br />Signatu of Official resentative Title Date <br />Tou rism-Related, Smal l-Scale Municipal ity-Owned Capital Project Budget <br />All applicants for capital project funding must supply a detailed and complete project budget <br />utilizing the following basic format: <br />Funding Sources <br />Lodging Tax Funds Request <br />*Other Grant Funds <br />List By Source (indicate if secured or applied) <br />*Other Local Government Funds <br />List By Source <br />*Private Funds <br />List By Source (may include in-kind) <br />Total Available Funding <br />Project Expenses <br />Real Property or "Right-of-Way" Acquisition Cost <br />Capital Asset Cost <br />Construction Cost or "Hard" Cost <br />lnclude an itemized list of general costs <br />For example: asset type and cost, site prep, building foundation and structure, <br />mechanical work, finish work, site restoration, electrical work, technology, etc. <br />Soft Cost <br />lnclude an itemized list of soft costs <br />For example: design fees, construction management fees, survey costs, <br />engineering fees, permitting costs, special inspections, cultural resource surveys, <br />etc. <br />Total Project Costs <br />*Verifying documentation must be provided and attached to this budget. This documentation <br />may include award letters, letters of commitment, or loan approval documentation. You must <br />include this in order to meet the matching funds requirement. lf the funding source includes <br />applicant funds, proof of available funding in the form of a letter of commitment from an <br />authorized body or representative of the applicant is adequate. <br />9
The URL can be used to link to this page
Your browser does not support the video tag.