Laserfiche WebLink
DCW Cost Mana@neehience power <br />Controls <br />Altemate Cost Before Markups <br />(1) EA <br />(260) SF <br />495.00 <br />5.00 <br />$e6P <br />(1,300) <br />(3,052) <br />(169,980) <br />Contingency <br />General Conditions <br />General Requirements <br />Office Overhead & Profit <br />Bonds and lnsurance <br />Permit <br />Escalation to Start Date (Q3 2023) <br />7.50Yo <br />6.50% <br />6.50% <br />5.50To <br />1.50o/o <br />0.00% <br />1.38o/o <br />(12,749) <br />(11,877) <br />(12,649) <br />(11,3ee) <br />(3,280) <br />(224,986) <br />Alternate 5: Building Option 3 - Portland Loo <br />DEDUCT <br />Comfort Station <br />ADD <br />Portland Loo <br />Alternate Cost Before Markups <br />Contingency <br />General Conditions <br />General Requirements <br />Office Overhead & Profit <br />Bonds and lnsurance <br />Permit <br />Escalation to Start Date (Q3 2023) <br />(1) LS 581,651.50 (581 ,652) <br />2 EA 165,000.00 330,000 <br />(251,652) <br />7.50o/o <br />6.50% <br />6.50% <br />550% <br />1.50o/o <br />0.00% <br />1.38o/o <br />(18,874) <br />(17,584) <br />(18,727) <br />(16,876) <br />(4,856) <br />(4,518) <br />(333,086)