My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
City of Ellensburg Capital-Unity Park Shade Tents
>
Meetings
>
2023
>
09. September
>
2023-09-05 10:00 AM - Commissioners' Agenda
>
City of Ellensburg Capital-Unity Park Shade Tents
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2023 1:13:49 PM
Creation date
8/31/2023 1:07:57 PM
Metadata
Fields
Template:
Meeting
Date
9/5/2023
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve a Resolution Adopting the Distribution of the 2023 Tourism-Related, Small-Scale Municipality-Owned Capital Projects Grant Funds
Order
6
Placement
Consent Agenda
Row ID
108557
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
188
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Alternate 4: Building Option 2 - Reduce Size <br />DEDUCT <br />Foundations <br />Stem wall <br />Cont. footing, 2x1 (CMU) <br />SOG,4" <br />Footing drain <br />Superstructure <br />Exterior walls - CMU <br />HSS beams, 6x6x3/8 <br />HSS beams, 6x6x8/8 <br />Joists - 2x8,24" OC <br />1/2" plywood sheathing <br />Tapered plaster soffit/roof overhang <br />Light well - metal clad <br />Exterior enclosure - CMU <br />Exterior glazing - storefront incl. operable ticket window <br />Door - HM, single <br />Door - glazed, double <br />Roofing <br />Membrane roof system - TPO <br />Coverboard <br />Vapor retarder <br />Roof insulation, R-49 <br />lntegral gutter w/ downspout <br />Skylight <br />Exterior enclosure <br />Exterior glazing - storefront incl. operable ticket window <br />Door - glazed, double <br />lnterior construction <br />lnterior of exterior - GWB <br />Door - WD, single <br />lnterior finishes <br />Walls - painted <br />Mechanical <br />Minisplit <br />Ductwork <br />Controls <br />Electrical <br />Feeders <br />Light lixtures - XL4 <br />(1e2) <br />(1 e2) <br />(1e2) <br />(1e2) <br />(25) <br />(48) <br />SF <br />SF <br />SF <br />SF <br />LF <br />SF <br />19.50 <br />8.45 <br />4.15 <br />6.50 <br />26.00 <br />I 15.00 <br />(3,744) <br />(1,622) <br />(7e7) <br />(1,248) <br />(650) <br />(5,520) <br />(35) LF <br />(1) CY <br />(275) SF <br />(35) LF <br />(170) SF <br />(0.8s) TN <br />(0.87) TN <br />(806) LF <br />(275) SF <br />(100) sF <br />(145) SF <br />(35) <br />(223) SF <br />(1) EA <br />(1) EA <br />(223) SF <br />(1) EA <br />1 10.00 <br />2,500.00 <br />6,1 25.00 <br />1 10.00 <br />6,125.00 <br />8.50 <br />2,200.00 <br />2.20 <br />4,500.00 <br />14.50 <br />8.50 <br />4.50 <br />450.00 <br />(24,530) <br />(2,500) <br />(6,125) <br />(24,530) <br />(6,125) <br />(1,8e6) <br />(2,200) <br />(704) <br />(4,500) <br />(3,016) <br />(2,210) <br />Atr NA <br />185.00 <br />13.10 <br />30.00 <br />(1,e25) <br />(247) <br />(3,603) <br />(1,050) <br />62.50 <br />'13,100.00 <br />'13,100.00 <br />18.50 <br />5.50 <br />45.00 <br />85.00 <br />(10,625) <br />(11,151) <br />(11,443) <br />(14,e18) <br />(1 ,513) <br />(4,500) <br />(12,325) <br />(223) <br />(1) <br />SF <br />EA <br />(320) SF <br />(1) EA <br />(208) LBs <br />(260) SF <br />(260) SF <br />(4) EA <br />(1,170) <br />(1,800)
The URL can be used to link to this page
Your browser does not support the video tag.