Laserfiche WebLink
DCW Cost Management <br />City of Ellensburg <br />Unity Park <br />50% Construction Documents Cost Plan May 2,2023 15 <br />Alternates <br />Unit Rate Total <br />Alternate 1 : Curved wall at stage (Brick in lieu of concrete) <br />DEDUCT <br />Concrete wall - curved <br />ADD <br />Brick wall - curved, 10' ht. <br />Concrete wall - curved, 18" ht. <br />Altemate Cost Before Markups <br />Contingency <br />General Conditions <br />General Requirements <br />Office Overhead & Profit <br />Bonds and lnsurance <br />Permit <br />Escalation to Start Date (Q3 2023) <br />863 SF <br />750 SF <br />,1 13 SF <br />55.00 <br />67.50 <br />41,250 <br />7,594 <br />(16,969) <br />(67.50) (58,21e) <br />7.50o/o <br />6.50% <br />6.50% <br />5.50% <br />1.50% <br />1.39o/o <br />(1,273) <br />(1,186) <br />(1,263) <br />(1 ,1 38) <br />(327) <br />by Owner <br />(30s) <br />(22,460)