DCW Cost Management
<br />City of Ellensburg
<br />Unity Park
<br />50% Construction Documents Cost Plan May 2,2023 11
<br />New Construction
<br />Quantity Unit TotalRate
<br />Water feature
<br />Basalt pavers - 12"x24"x4"
<br />Recirculating water feature
<br />Mechanical equipment - pumps, filters, disinfectant and controls
<br />Mechanical vault w/ recessed hatch access
<br />Concrete support pad - 5'x5'x4'
<br />Granite slabs, irregular , 6-9" thk.
<br />Basin w/weir
<br />Comfort station building
<br />Foundations
<br />Stem wall
<br />Cont. footing, 2x1 (CMU)
<br />SOG,4"
<br />Footing drain
<br />Steel - pipe
<br />Superstructure
<br />Exterior walls - CMU
<br />HSS beams, 6x6x3/8
<br />HSS beams, 6x6x8/8
<br />W12x26
<br />Joists - 2x8,24" OC
<br />1/2" plywood sheathing
<br />Tapered plaster soffit/roof overhang
<br />Light well - metal clad
<br />Exterior enclosure - CMU
<br />Cladding - brick
<br />Exterior glazing - storefront incl. operable ticket window
<br />Door - HM, single
<br />Door - glazed, double
<br />Wayfinding
<br />Roofing
<br />Membrane roof system - TPO
<br />Coverboard
<br />Vapor retarder
<br />Roof insulation, R-49
<br />lntegral gutter w/ downspout
<br />Skylight
<br />lnterior construction
<br />Partition - CMU
<br />lnterior of exterior - GWB
<br />Door - WD, single
<br />120
<br />21
<br />720
<br />120
<br />2
<br />55.00
<br />750.00
<br />13.10
<br />30.00
<br />685.00
<br />6,600
<br />15,944
<br />9,432
<br />3,600
<br />1,370
<br />365 SF
<br />365 SF
<br />45 SF
<br />1LS
<br />1LS
<br />SF
<br />EA
<br />EA
<br />ZI
<br />42.50
<br />200.00
<br />60,000.00
<br />20,000.00
<br />20.00
<br />2,250.00
<br />1 ,100.00
<br />15,513
<br />9,000
<br />60,000
<br />20,000
<br />540
<br />33,750
<br />3,300
<br />62.50
<br />1 3,1 00.00
<br />1 3,'1 00.00
<br />1 3,1 00.00
<br />18.50
<br />5.50
<br />45.00
<br />85.00
<br />15
<br />a
<br />720 SF
<br />627
<br />2.43
<br />tqn
<br />0.21
<br />2,304
<br />1,190
<br />375
<br />145
<br />LF
<br />\-Y
<br />SF
<br />LF
<br />EA
<br />SF
<br />TN
<br />TN
<br />TN
<br />LF
<br />SF
<br />SF
<br />SF
<br />62.50
<br />8.50
<br />2,200.00
<br />39,188
<br />31,859
<br />32,694
<br />2,725
<br />42,624
<br />6,545
<br />16,875
<br />12,325
<br />30,000
<br />5,330
<br />2,200
<br />578 SF
<br />223 SF
<br />3EA
<br />lEA
<br />1LS
<br />55.00
<br />1 10.00
<br />2,500.00
<br />6,1 25.00
<br />1,500.00
<br />a4 70n
<br />24,530
<br />7,500
<br />6j25
<br />1,500
<br />1,142 SF
<br />1,142 SF
<br />1,142 SF
<br />1,142 SF
<br />,I5O LF
<br />48 SF
<br />19.50
<br />8.45
<br />4.15
<br />6.50
<br />26.00
<br />115.00
<br />22,269
<br />9,650
<br />4,739
<br />7,423
<br />3,900
<br />5,520
<br />480 SF
<br />627 SF
<br />1EA
|