Laserfiche WebLink
DCW Cost Management <br />City of Ellensburg <br />Unity Park <br />50% Construction Documents Cost Plan May 2,2023 I <br />New Construction <br />TotalQuantity Unit Rate <br />Demo - irrigation <br />Demo - tree <br />Demo - light poles <br />Demo - utilities, incl. power and telephone services <br />Demo - storm sump pump <br />Demo - storm system <br />Demo - cap existing services for reuse (water and sewer) <br />Demo - wood pavilion, incl. conc steps and conc wall <br />Salvage and relocate - bull statue <br />Salvage - bell tower <br />Salvage - wind sculptures <br />Salvage - basalt columns and boulders <br />Salvage - bench <br />Salvage - metal pedesial <br />Salvage - wall plaques <br />Salvage - light pole <br />Salvage - flag pole <br />Salvage - signage <br />G1030 Site Earthwork <br />Site cut - 1' depth <br />Haul and dispose <br />Fill - stockpile, assume 20% <br />Grading and contouring <br />Base aggregates <br />G1040 Hazardous Waste Remediation <br />No work anticipated <br />3 SF <br />EA <br />EA <br />LS <br />890 0.1 q <br />550.00 <br />850.00 <br />15,000.00 <br />584 <br />4,950 <br />3,400 <br />15,000 <br />incl. above <br />incl. above <br />incl. above <br />6,788 <br />1,700 <br />1,200 <br />2,250 <br />2,000 <br />4,900 <br />250 <br />400 <br />2,100 <br />2,400 <br />2,000 <br />I <br />4 <br />1 <br />905 SF,1 EA <br />1EA <br />3EA <br />1LS <br />14 EA <br />1EA <br />2EA <br />2EA <br />3EA <br />1LS <br />7.50 <br />1,700.00 <br />1,200.00 <br />750.00 <br />2,000.00 <br />350.00 <br />250.00 <br />200.00 <br />1,050.00 <br />800.00 <br />2,000.00 <br />804 CY <br />644 CY <br />161 CY <br />21,721 SF <br />302 CY <br />20.00 <br />22.00 <br />12.00 <br />0.35 <br />55.00 <br />16,090 <br />14,159 <br />'1,931 <br />7,602 <br />16,583 <br />NIC <br />G20 Site lmprovements 22,811 SF 64.17 1,463,965 <br />G2010 Roadways <br />Demolition <br />Demo - brick, incl. subgrade materials <br />Sawcut <br />Demo - curb <br />Pothole existing sewer <br />Site prep and earthwork <br />Tree protection <br />Site and utility protection <br />Site cut - 1' depth <br />Haul and dispose <br />675 <br />310 <br />98 <br />1 <br />4.50 <br />7.50 <br />9.00 <br />2,500.00 <br />SF <br />LF <br />LF <br />LOC <br />3,038 <br />2,325 <br />882 <br />2,500 <br />3,750 <br />3,500 <br />807 <br />711 <br />5EA <br />1LS <br />40 CY <br />32 CY <br />750.00 <br />3,500.00 <br />20.00 <br />22.00