Laserfiche WebLink
DCW Cost Management <br />City of Ellensburg <br />Unity Park <br />New Construction <br />50% Construciion Documents Cost Plan May 2,2023 4 <br />22,811 117.06 2,670,296 <br />Overall Summary <br />SF $/SF TOTAL <br />TOTAL RiCOMI\4END;D BUDGET 2,670,296 <br />ALTTRNATES <br />Alternate 1 <br />Alternate 2 <br />Alternate 3 <br />Alternate 4 <br />Alternate 5 <br />Curved wall at stage (Brick in lieu of concrete) <br />Building Option 1A - Unconditioned concierge area <br />Building Option 1B - Unconditioned concierge area, reduced wall <br />Building Option 2 - Reduce Size <br />Building Option 3 - Portland Loo <br />(22,460) <br />(46,432) <br />(61,058) <br />(224,986) <br />(333,086)