Laserfiche WebLink
TASK ORDER 2O23.XX <br />Bowers Business Park Feasibility Study <br />ASSUMPTIONS AND EXCEPTIONS <br />. Appraisals from the previous202l report will be used as the baseline for property <br />valuation. lf it is determined that additional analysis is needed, Valbridge Properties (or <br />another appraiser) may be engaged, with approval by the client.. Design, Bidding, and Construction Administration services are not included in this scope <br />of work. <br />o Detailed on-site investigations regarding soil analysis, topography, etc. are not anticipated.. Engineering design of utilities, rail lines, structure or any roadway improvements are not <br />included. <br />o Development of design guidelines or Covenants, Conditions and Restrictions (CC&R's) for <br />the site are not anticipated. <br />. Lighting and landscape plans are not included.o Platting is not included. <br />. Boundary, Topographical or ALTA surveys are not included.o lntersection plans or signal warrant analysis are not anticipated.o Geotechnical lnvestigations are not included.o Phase 1 Environmental is not included.. Permitting applications are not included.r Landscaping and entry monument concept are not included.o Preparation for UGA expansion application for the project area is not included. <br />DELIVERABLES <br />o Conceptual Site Layouts for County Review. Draft Master Plan for County Review. Final Master Plan <br />SCHEDULE OF SERVICES <br />J-U-B will perform all services according to the following schedule: <br />May 2023 - March 2024 <br />This Agreement shall be in effect from May X, 2023 to June 30,2024. <br />This schedule shall be equitably adjusted as the PROJECT progresses, allowing for changes in <br />scope, character or size of the PROJECT requested by the CLIENT or for delays or other causes <br />beyond J-U-B's control. <br />Page 7 of9