Laserfiche WebLink
TASK ORDER 2O23.XX <br />Bowers Business Park Feasibility Study <br />Ellensburg based upon build-out of the site. lnformation will be collected to layout <br />and master plan the domestic/process water and fire flow requirements to serve the <br />development at build-out conditions. <br />Task 9.3: Sanitary Sewer <br />Summarize the results of the Comprehensive Sewer System Plan and the ability to <br />serve the site with sanitary sewer. Review any impacts to off-site sanitary sewer <br />collection system facilities owned by the City based upon build-out of the site. lt is <br />assumed that any potential process wastewater from development would be <br />discharged into the sanitary sewer system. <br />Task 9.4: Stormwater <br />ldentify stormwater collection options to service the area. lt is assumed that post- <br />development flows will be limited to a peak flow equivalent to that of existing <br />conditions. <br />Task 9.5: Miscellaneous Utilities: <br />i. Task 9.51: lrrigation <br />ldentify irrigation demands/requirements and providers for the proposed <br />industrial site. <br />ii. 9.52: Electrical <br />Coordinate with the appropriate electrical utility provider to identify the main <br />infrastructure requirements to serve the lndustrial Area. <br />iii. Task9.53:Telecommunications <br />Coordinate with the appropriate telecommunications utility providers to <br />identify the main infrastructure requirements to serve the lndustrial Area. <br />iv. Task 9.54 Natural Gas: <br />Coordinate with the appropriate regional natural gas supplier(s) to review <br />possible extension of lines and to coordinate possible industrial user services <br />for the lndustrial Area. <br />Task 9.6 - Cost Ooinions <br />Develop cost opinions that would include external and internal roadways, stormwater <br />facilities, domestic and process water, and sanitary sewer, as well as coordinate site <br />electrical, telecommunications and natural gas costs. These opinions will help the <br />County determine infrastructure costs for the overall development. Cost opinions will <br />also include off-site infrastructure improvements needed to bring infrastructure to <br />the project area. <br />Task 10: Funding Assistance <br />1. Once costs and actionable items are identified, J-U-B will explore options for funding <br />various improvements. A list of potential grant and/or loan funding sources will be <br />Page 5 of9