My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RES 2023-123
>
Meetings
>
2023
>
08. August
>
2023-08-01 10:00 AM - Commissioners' Agenda
>
RES 2023-123
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2023 2:40:35 PM
Creation date
8/15/2023 2:40:23 PM
Metadata
Fields
Template:
Meeting
Date
8/1/2023
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Item
Request to Approve a Resolution to Allow an Application for a Community Economic Revitalization Board Grant
Order
5
Placement
Consent Agenda
Row ID
106478
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TASK ORDER 2023.Y\X <br />Bowers Business Park Feasibility Study <br />o EnvironmentalDocuments <br />o Land Ownership <br />. Appraisal lnformation (previously provided as "Appraisal Report, 2021').o Existing Development Planso Site Topography <br />. Local & Regional Demographics (existing & projected). Community Land Use issues (residential, parks, schools, etc.). Utility and roadway lnformation <br />o Future and Existing Land Use maps & Plans. Zoning Designations <br />o Land Use Restrictions/Encumbrances <br />. Airspace Analysis <br />Task 6: Economic/Market Feasibility <br />1. The overall goal of the Economic Feasibility Study work scope component is to analyze <br />economically feasible industrial uses for the proposed site. This task will be vital in the <br />future phases of the project. The economic analysis will allow us to identify key industries <br />who may be interested in this site. This information will be used later in this project to <br />identify lot size and configuration, infrastructure needs, and wastewater treatment <br />options. Tasks will include:o lnterview key stakeholders to gather and review pertinent project background data.. Assess the locational characteristics of the site relative to the industrial market.r Evaluate the overall Kittitas County area economic outlook for industrial real estate <br />development. <br />. Conduct interviews with selected key persons in the Ellensburg catchment area <br />knowledgeable of demand potentials by various industrial uses (e.g. complementary <br />agricultural processing/supplier needs, light manufacturing, warehouse distribution, <br />flex spaces, etc.). <br />o ldentify and evaluate potentially competing site and corresponding industrial uses. <br />This will include industrial comps within the county and any conclusions that can be <br />drawn from the "Appraisal Report, 2021." lf additional analysis is needed, Valbridge <br />Properties (or another appraiser) may be engaged, with approval by the client.. Analyze which target industries may locate at the site, including a supply chain <br />analysis to identify potential growth opportunities.o Recommend specific industries (and possibly specific businesses) that should be <br />ta rgeted prospective tenants. <br />r Forecast economic impacts fiobs)to Kittitas County and City of Ellensburg if the site <br />is fully tenanted with the prescribed potential industrial users.. Recommend a project marketing and funding strategy for the site. <br />Page 3 of9
The URL can be used to link to this page
Your browser does not support the video tag.