My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Kitititas County SH22-020 - WASPC COVID MITIGATION - CONTRACT - Date Amended - partially executed
>
Meetings
>
2023
>
08. August
>
2023-08-15 10:00 AM - Commissioners' Agenda
>
Kitititas County SH22-020 - WASPC COVID MITIGATION - CONTRACT - Date Amended - partially executed
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2023 12:54:55 PM
Creation date
8/10/2023 12:53:42 PM
Metadata
Fields
Template:
Meeting
Date
8/15/2023
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Acknowledge a Modification to the Contract between the Washington Association of Sheriffs & Police Chiefs and the Kittitas County Jail
Order
12
Placement
Consent Agenda
Row ID
107456
Type
Grant
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8. ALLOWABLE COSTS. Allowable costs shall include costs incurred by CONTRAC- <br />TOR from the first date of the CONTRACT period until the CONTRACT is terminated or <br />expires as provided herein, but in no event shall allowable costs exceed the maximum stated <br />amount of the CONTRACT as provk-led-providedon Line 8 of the CONTRACT Face Sheet. <br />Costs allowable under this CONTRACT are based on a budget approved by_WASPC. <br />WASPC shall pay to CONTRACTOR all allowable costs incurred from the first date of the <br />CONTRACT period until this CONTRACT is terminated or expires evidenced by proper <br />expenditure reconciliation report, submitted to WASPC on a timely basis, insofar as those <br />allowable costs do not exceed the amount appropriated or otherwise available for such <br />purposes as stated on the CONTRACT Face Sheet. <br />9. NON -SUPPLANTING. This award is retroactive for unanticipated costs, associated <br />with the Detection and Mitigation of COVID-19 in jails, from November 1, 2021, through <br />December 31, 2022. Supplanting restrictions do not apply to these costs unless other local <br />or state funds have been dedicated to this work. Otherwise, the CONTRACTOR shall not use <br />state funds specified by this CONTRACT to supplant local, federal, or other state funds. <br />CONTRACTOR shall not use state funds specified by this Contract to replace funding which <br />would otherwise be made available to CONTRACTOR had the state funds provided by this <br />CONTRACT not been provided. <br />10. CONTRACT ADMINISTRATION. WASPC's Program Coordinator is responsible for <br />monitoring the performance of this CONTRACT, including approval and acceptance of reports <br />provided by CONTRACTOR. WASPC's Program Coordinator may provide and facilitate <br />assistance and guidance to CONTRACTOR as necessary. <br />11. PROGRAM ADMINISTRATION. CONTRACTOR shall advise WASPC of the local <br />program administrator responsible for the performance of this CONTRACT, including name, <br />address, email, telephone number(s), and any subsequent changes thereto. <br />12. DATA COLLECTION. The CONTRACTOR shall utilize the data collection tool <br />provided by WASPC, hereinafter referred to as the WASPC Data Collection Tool, which is an <br />Excel Spreadsheet." CONTRACTOR shall dedicate sufficient resources to establish the <br />administrative processes necessary for the Data Collection Tool to be fully operational at the <br />time treatment begins at the -any of the jails. <br />13. REPORTING REQUIREMENTS. CONTRACTOR shall timely submit required reports <br />using the forms according to procedures issued by WASPC. <br />14. REPORT DUE DATES <br />a. Monthly Progress Report. Due on the 10th of the month following the <br />previous month in which funded activities were performed. <br />b. Semi -Annual Progress Report. Due on the 10th of the month following the <br />six-month period in which funded activities were performed. <br />C. Final Assessment Report. Due on the 10th of the month following the twelve- <br />month period in which funded activities were performed. <br />D&M COVI D 19 Jails Contract-2022-001 Page 3 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.