My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-06-14-minutes-solid-waste-and-maintenance
>
Meetings
>
2023
>
08. August
>
2023-08-01 10:00 AM - Commissioners' Agenda
>
2022-06-14-minutes-solid-waste-and-maintenance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/27/2023 12:33:45 PM
Creation date
7/27/2023 12:29:31 PM
Metadata
Fields
Template:
Meeting
Date
8/1/2023
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
106478
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Roen Associates Kittitas County <br />500 Union Street, Suite 927 Courthouse and Government Office - Sitework <br />Seattle, WA 98101 Predesign Estimate <br />RoEN <br />ASS O C I ATE S <br />DETAILED ESTIMATE <br />Quantity <br />Unit of <br />Measure <br />Unit <br />Cost <br />Total Estimated <br />Cost <br />No. <br />Description <br />Tie-in at Existing <br />1 <br />ea <br />$ 5,500.00 <br />$5,500 <br />Irrigation included w/ Landscaping above <br />$ - <br />$0 <br />Sanitary Sewer Systems <br />Sanitary Sewer <br />1 <br />Is <br />$ 30,000.00 <br />$30,000 <br />Storm Sewer Systems <br />Storm Sewer System <br />345,823 <br />SGA <br />$ 1.50 <br />$518,735 <br />Other Civil / Mechanical Utilities <br />Natural Gas Connection - None <br />- <br />$0 <br />SUBTOTAL SITE CIVIL / MECHANICAL UTILITIES <br />345,823 <br />SGA <br />$2.17 <br />$751,895 <br />G40 SITE ELECTRICAL UTILITIES <br />Electrical and Telecom Utilities <br />Electrical Utility - Primary <br />1 <br />Is <br />$ 350,000 <br />$350,000 <br />Tele/Data Utility (341" incoming provider and owner) <br />1 <br />Is <br />$ 75,000 <br />$75,000 <br />Site Lighting & Power <br />345,823 <br />gsf <br />$ 2.00 <br />$691,646 <br />Site Security (CCTV) <br />1 <br />Is <br />$ 150,000 <br />$150,000 <br />Site Power / Car Chargers - Allowance <br />1 <br />Is <br />$ 100,000 <br />$100,000 <br />Site Demo (Demo service conduits serving existing building and <br />existing parking) <br />1 <br />Is <br />$ 50,000 <br />$50,000 <br />SUBTOTAL SITE ELECTRICAL UTILITIES <br />345,823 <br />SGA <br />$4.10 <br />$1,416,646 <br />------------- <br />G50 OTHER SITE CONSTRUCTION <br />$0 <br />SUBTOTAL OTHER SITE CONSTRUCTION <br />345,823 <br />SGA <br />$0.00 <br />$0 <br />Z10 GENERAL REQUIREMENTS <br />General Conditions <br />See Summary <br />SUBTOTAL GENERAL REQUIREMENTS <br />345,823 <br />SGA <br />$0.00 <br />$0 <br />Page 11 of 11 <br />34 IUDLRGROUP <br />
The URL can be used to link to this page
Your browser does not support the video tag.