Laserfiche WebLink
EX rAil <br />SCOPE OF WORK <br />ln addition to providing all material and labor, the Contractor shall perform the following <br />1. The Contractor is to remove units listed below along with all accessory <br />attachments and <br />a) Unit 7 <br />b) Unit 10 <br />c) Unit 19 <br />d) Unit 28 <br />e) Unit 34 <br />D Unit 35 <br />g) Unit 37 <br />h) Unit 39i) Unit 40j) Unit 41 <br />k) Unit 50l) Unit 64 <br />m) Unit 73 <br />n) Unit74 <br />o) LaundryRoom <br />p) Remove perimeter wood fence behind Space #7 and Space #19 <br />2. The County has turned off allwater and power to these units, but the <br />Contractor is responsible for disconnecting all utilities from the units and <br />marking the utilities per City of Ellensburg requirements. <br />3. To the extent possible the Contractor is to recycle as much of the metal as <br />possible. <br />4. Contractor is responsible for removing and disposing of all garbage and <br />other materials inside and outside or the units. <br />5. A Hazardous material assessment has been completed for all of the <br />structures and all identified materials will need to be removed in <br />accordance with industry standards. <br />The Contractor is responsible for obtaining all necessary permits, licenses, and <br />insurance, and ensuring all related regulatory compliance under Federal and State law, <br />including those specific requirements of the Washington Department of Labor and <br />Industries, City and County. <br />P rofessi ona I Se rvices Ag reem ent (r eu . O9 124 l2O1 8) <br />Page 13 of 17