My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RES 2023-112
>
Meetings
>
2023
>
07. July
>
2023-07-05 10:00 AM - Commissioners' Agenda
>
RES 2023-112
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/13/2023 4:00:26 PM
Creation date
7/13/2023 4:00:21 PM
Metadata
Fields
Template:
Meeting
Date
7/5/2023
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Item
Request to Approve a Resolution Authorizing the Chair's Signature on the Local Agency Federal Aid Project Prospectus for the Replacement of Bridge No. 88212 on Faust Road over Town Ditch CRP 316-22
Order
11
Placement
Consent Agenda
Row ID
105344
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Agency <br />Kittitas County Public Works <br />Project Title <br />Faust Road over Towne Ditch <br />Date <br />612612023 <br />ofP ed Work <br />Project Type (Check all that Appty) <br />tr trtew Construction f] path / Trail fls-n <br />I Reconstruction I eeoestrian / Facitities f]Z-nI Raitroad I parking ! otner <br />Z arioge <br />Roadway Width <br />26 <br />Number of Lanes <br />2 <br />Geometric Des n Data <br />Description Through Route Crossroad <br />Federal <br />Functional <br />Classification <br />I PrincipalArterial <br />flMinorArteriat <br />I Cottector <br />! Valor Collector <br />f]Vtinor Cottector <br />Z Locat Access <br />Urban <br />M Rurat <br />X r'rHs <br />! urnan <br />flRurat <br />n r.rHS <br />! erincipqlArterial <br />I winor Arteriat <br />! Cottector <br />! tilalor Collector <br />fltvtinor Coilector <br />! tocat Access <br />Terrain Roll MountainFlat Flat Roll ntain <br />Posted 35 <br />Design Speed 35 <br />Existing ADT 100 <br />Design YearADT 100 <br />Design Year 2022 <br />Design Volume (D <br />Performance of Work <br />Preliminary Engineering Will Be Performed By <br />split between consuitant and agency <br />Others <br />50 % <br />Agency <br />50 % <br />Conshuction Will Be Performed By <br />contract o/to <br />Contract <br />100 <br />Agency <br />o//o <br />Environmental Classification <br />Class I - Environmental lmpact Statement (ElS) <br />! Project lnvolves NEPA/SEPA Section 404 <br />lnteragency Agreement <br />I Ctass lll - EnvironmentalAssessment (EA) <br />I Project lnvolves NEPA/SEPA Section 404 <br />lnteragency Agreements <br />fl Ctass ll - Categoricaily Exctuded (CE) <br />I Projects Requiring Documentation <br />(Documented CE) <br />work over irrigation canal will be performed while canal system is not in service between November andApril. <br />Environmental Considerations <br />Form <br />Revised 0112022 Previous Editions 0bsolete
The URL can be used to link to this page
Your browser does not support the video tag.