Laserfiche WebLink
Agency <br />Kittitas County Public Works <br />Project Title <br />Faust Road over Towne Ditch <br />Date <br />6/26/2023 <br />pe of Proposed Work <br />Type (Check all that Apply) <br />Roadway Width <br />Number of Lanes <br />rProject <br />New Construction ElPath / Trail ❑ 3-R <br />26 <br />2 <br />Reconstruction ❑ Pedestrian / Facilities ❑ 2-R <br />Railroad ❑ Parking ❑ Other <br />�✓ Bridge <br />l2cnme+r:n r1e�:.... n�a� <br />Description <br />Through Route <br />Crossroad <br />❑ Principal Arterial <br />❑ Principal Arterial <br />Federal <br />Urban <br />❑Minor Arterial <br />❑ Urban <br />❑ Minor Arterial <br />Functional <br />�✓ Rural <br />❑ Collector <br />❑Rural <br />❑Collector <br />CIaSSIflCatlOn <br />❑NHS <br />❑Major Collector <br />❑ NHS <br />❑ Ma or Collector <br />j <br />❑ Minor Collector <br />❑ Minor Collector <br />❑✓ Local Access <br />El Local Access <br />Terrain <br />❑ Flat <br />✓0 Roll ❑ Mountain <br />❑ Flat <br />❑Roll ❑Mountain <br />Posted Speed <br />35 <br />Design Speed <br />35 <br />Existing ADT <br />100 <br />Design Year ADT <br />100 <br />Design Year <br />2022 <br />Design Hourly Volume (DHV) <br />rauvr n1GnuL or vvorK <br />Preliminary Engineering Will Be Performed By <br />split between consultant and agency <br />Others <br />Agency <br />Construction Will Be Performed By <br />50 ova <br />50 <br />Contract <br />Agency <br />contract <br />100 <br />of <br />e, <br />Environmental Classification <br />❑ Class I - Environmental Impact Statement (EIS) ❑✓ Class If - Categorically Excluded (CE) <br />❑ Project Involves NEPA/SEPA Section 404 ❑ Projects Requiring Documentation <br />Interagency Agreement (Documented CE) <br />❑ Class III - Environmental Assessment (EA) <br />❑ Project Involves NEPA/SEPA Section 404 <br />Environmental Considerations <br />work over irrigation canal will be performed while canal system is not in service between November and <br />April. <br />Revised 01/2022 Previous Editions Obsolete <br />