My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution_CRP_VantageHighwayPavingProject
>
Meetings
>
2023
>
07. July
>
2023-07-05 10:00 AM - Commissioners' Agenda
>
Resolution_CRP_VantageHighwayPavingProject
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/29/2023 12:43:59 PM
Creation date
6/29/2023 12:43:47 PM
Metadata
Fields
Template:
Meeting
Date
7/5/2023
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve a Resolution Initiating a County Road Project Designated as CRP No. 317-23, Vantage Highway Paving
Order
8
Placement
Consent Agenda
Row ID
105344
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RESOLUTION NO. <br />BEFORE THE BOARD OF COUNTY COMMISSIONERS OF KITTITAS COUNTY, STATE OF WASHINGTON, in the matter <br />of initiating a county road project designated as: <br />CRP NO: 317-23 JOB NO: RC 2296 <br />IT IS HEREBY RESOLVED that the Vantage Highway Paving be improved as follows: <br />The project will plane the existing asphalt surface on Vantage Highway MP 2.027 - MP 6.56 to remove up to 3" of asphalt, <br />and then replace with a new hot mixed asphalt wearing surface and install new roadway striping and markings. <br />ARTERIAL x <br />ACCESS <br />This project is hereby declared to be a public necessity and the County Engineer is hereby ordered and authorized to report and <br />proceed thereon as by law provided. (RCW 36.75.050, 36.80.030, 36.80.070). <br />IT IS FURTHER RESOLVED that an appropriation from the officially adopted road fund budget and based on the County <br />Engineers estimate, is hereby made in the amounts and for the purposes shown: <br />0 <br />E <br />Fe-1 <br />PURPOSE <br />AMOUNT <br />TOTALS <br />PRELIMINARY ENGINEERING <br />$ 200,000 <br />CONSTRUCTION ENGINEERING <br />$ 250,000 <br />RIGHT-OF-WAY ACQUISITION <br />$ <br />SUB -TOTAL <br />$ 450,000 <br />County Forces CONSTRUCTION <br />$ <br />CONTRACT CONSTRUCTION <br />$ 3,499,965 <br />SUB -TOTAL <br />$ 3,499,965 <br />TOTAL PROJECT COST <br />$ 3,949,965 <br />GRANT OR OTHER FUNDS <br />$ 3,416,720 <br />Grant Source: STBG A <br />is <br />TOTAL COUNTY ROAD FUND ALLOCATION <br />533,245 <br />Joshua Fredrickson, P.E. <br />County Engineer <br />THIS PROJECT IS INCLUDED IN THE OFFICIALLY ADOPTED 2023 ANNUAL ROAD PROGRAM AS <br />ITEM NO. <br />THIS PROJECT IS HEREBY MADE A PART OF THE OFFICIALLY ADOPTED ANNUAL ROAD PROGRAM PROJECT 13 <br />IN ACCORDANCE WITH RCW 36.81.130 <br />IT IS FURTHER RESOLVED THAT: <br />THE CONSTRUCTION IS TO BE ACCOMPLISHED BY CONTRACT IN ACCORDANCE WITH RCW 36.77.020 ET.SEQ. <br />❑ THE CONSTRUCTION IS TO BE ACCOMPLISHED BY COUNTY FORCES IN ACCORDANCE WITH RCW 36.77.065 AND <br />WAC 136-18. <br />Attest: -_..... . _ .. . _. <br />ADOPTED this 5th day of July, 2023. <br />BOARD OF COUNTY COMMISSIONERS ( Clerk of the Board <br />KITTITAS COUNTY, WASHINGTON <br />Cory Wright, Chair <br />Brett Wachsmith, Vice -Chair <br />Laura Osiadacz, Commissioner <br />g:\base\forms\eng\crp-frm 6/26/2023 <br />
The URL can be used to link to this page
Your browser does not support the video tag.